Log in to see the plans as drawn8. Roles and Responsibilities
Table 8 outlines the responsibilities of parties with respect to ESC.
Table 8 - Roles and Responsibilities
Role Responsibility
Project Manager Overall responsibility of ESC implementation
Notify the Environmental Manager immediately of any non-compliance
with ESCP
Ensure the prompt implementation of measures to mitigate erosion and
sediment generation
Site Supervisor/Foremen Monitor daily rainfall
Notify Environmental Advisor/Consultant when runoff generating
rainfall occurs in the previous 24 hours
Maintain current records of rainfall, storage volumes, water quality,
treatment practices, discharge volumes (as appropriate)
Installation and maintenance of ESC
Environmental Manager Provide design information as required
Conduct in-situ monitoring (as required)
Collect and submit samples to laboratory (as required)
Collate results and prepare reports (as required)
Conduct site inspections and audits (as required)
Inspect ESC installation and maintenance
Inspect offsite impacts and management
Provide advice regarding ESC site improvement (as required)
All Personnel Report any damage to ESC devices and any potential or actual
environmental harm in line with Duty to Notify under the requirements
of the Environmental Protection Act 1994
71 Seaview Terrace, Sunshine Beach - Erosion and Sediment Control Plan Page 9
Hutchinson Builders
17SUN-0024/1600102
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.