Log in to see the plans as drawnDiversion Bund Sizing
Qy = (Cy x Itc,y x A)/360 Equation 1 (IECA 2008)
Where:
Qy= Peak flow rate (m3/s) of average recurrence interval (ARI) of Y years
Cy= runoff coefficient (dimensionless) for ARI of Y years
Itc,y= Average rainfall intensity (mm/hr) for design duration of tc hours and ARI of Y years.
A= Area of catchments (ha)
360= Conversion Factor
Flow height is solved by trial and error using the three equations below as per IECA 2008. Job No. 17SUN-0024
Client HUTCHINSON
2/3 1/2
Q = 1/n x A x R xS Equation 2 (IECA 2008) Job 71 SEAVIEW TERRACE
Where Date 3/8/2016
3
Q= Peak flow rate (m /s) of average recurrence interval (ARI) of Y years
n= Mannings coefficieint (unitless)
A= Cross sectional area of flow (m2), refer to Eqaution 3
R= Hydraulic Radius (m), refer to Equation 4
S= Slope of energy line, equal to slope of chanel bed (m/m)
A = (b + xy)y Equation 3 (IECA 2008)
Where
2
A= Cross sectional area of flow (m )
b= Base width of channel (m)
x= side slope of channel
y= depth of flow in channel (m) + required 0.15m freeboard
R = ((b + xy)y) / (b+2y(1+x2)1/2) Equation 4 (IECA 2008)
Where
R= Hydraulic radius of flow (m)
b= Base width of channel (m)
x= side slope of channel
y= depth of flow in channel (m) + required 0.150m freeboard
Peak Flow Calcs Velocity
INPUTS OUTPUTS Inputs Outputs
Flow Depth Maximum
Channel Flow Depth with 150mm Permissable
Catch Drain Label Peak Flow Side Slope 1 Side Slope 2 Slope (m/m) Proposed Lining Mannings Peak Flow (m) Feeboard Velocity (m/s) Velocity (m/s)
C10 Itc,y Tc A F Q5 x1 x2 So n Q y Vmax V
DB1 0.70 203 5 0.030 0.95 0.01 2 10 0.029 Geofabric 0.0220 0.011 0.078 0.228 1.500 0.308
DB2 0.70 203 5 0.080 0.95 0.03 2 10 0.250 Geofabric 0.0220 0.030 0.076 0.226 1.500 0.866
DB3 0.70 203 5 0.020 0.95 0.01 2 10 0.250 Geofabric 0.0220 0.007 0.050 0.200 1.500 0.500
DB4 0.70 203 5 0.030 0.95 0.01 2 10 0.300 Geofabric 0.0220 0.011 0.054 0.204 1.500 0.643
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.