24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                   Equation 1 (IECA 2008)

                       Peak flow rate (m3/s) of average recurrence interval (ARI) of Y years
                       runoff coefficient (dimensionless) for ARI of Y years
                       Average rainfall intensity (mm/hr) for design duration of tc hours and ARI of Y years.
                       Area of catchments (ha)
                       Conversion Factor

olved by trial and error using the three equations below as per IECA 2008.

                                   Equation 2 (IECA 2008)

                       Peak flow rate (m3/s) of average recurrence interval (ARI) of Y years                                                                                                                                                 Drainage Design Standard for Temporary Drainage Works (as per Table A1 of IECA, 2008)
                       Mannings coefficieint (unitless)                                                                                                                                                                                                                                                         Operational Design Life
                       Cross sectional area of flow (m2), refer to Eqaution 3                                                                                                                                                                                   Location                       < 12 months
                       Hydraulic Radius (m), refer to Equation 4                                                                                                                                                                             QLD, NT, northern WA                              1 in 2 year
                       Slope of energy line, equal to slope of chanel bed (m/m)                                                                                                                                                              NSW, VIC, TAS, SA, southern WA                    1 in 5 year
                                                                                                                                                                                                                                             Note:
                                   Equation 3 (IECA 2008)                                                                                                                                                                                    If temporary drainage structure located immediately upslope of an occupied property that would be
                                                                                                                                                                                                                                             adversely affected by the failure or overtopping of the structure adopt a minimum of 1 in 10 year design
                       Cross sectional area of flow (m2)                                                                                                                                                                                     Temporary culvert crossing shall adopt a minimum of 1 in 1 year hydraulic capacity
                       Base width of channel (m)                                                                                               Figure 1 Cross-section of Chute                                                               Minimum 150mm freeboard additional to design capacity
                       side slope of channel
                       depth of flow in channel (m) + required 0.15m freeboard
                                                                                                                                                                                                                                             Frequency Factor (as per Table A7 of IECA, 2008)
                                   Equation 4 (IECA 2008)

                       side slope of channel
                       depth of flow in channel (m) + required 0.30m freeboard



                                                                                                        Property of O2 Environment + Engineering. Use of this spreadsheet is at the users risk.
                                                                                                        O2 Environment + Engineering waives all liability to any third party loss, damage, liability or claim
                                                                                                        arising out of using or relying on the calculations, results or output of this spreadsheet.

                                                     Peak Flow Calcs                                                                                                                                        Velocity
                                           INPUTS                                        OUTPUTS                                               Inputs                                                                                        Outputs


                                                                                                          Channel                                                                                                                                                         Maximum
                                                                                                         Base Width      Side Slope       Channel                                                                                              Flow Depth with       Permissable Velocity
                                                                                             Q5             (m)            Length        Slope (m/m) Proposed Lining                             Mannings       Peak Flow   Flow Depth (m)     150mm Feeboard               (m/s)              Velocity (m/s)


                          C10         Itc,y     Tc           A                F                                  b             x              So                                                      n             Q             y                                           Vmax                    V
                                          Refer Aquaintel SMP                               0.153               0.6            2             0.029      Geofabric                                  0.0220         0.153         0.119                0.269                    1.500                 1.534
                           0.7        203        5          0.1              0.95           0.037               1.2            2             0.250      Geofabric                                  0.0220         0.037         0.019                0.169                    1.500                 1.594
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.