Original source · versioned page text
24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Equation 1 (IECA 2008)
Peak flow rate (m3/s) of average recurrence interval (ARI) of Y years
runoff coefficient (dimensionless) for ARI of Y years
Average rainfall intensity (mm/hr) for design duration of tc hours and ARI of Y years.
Area of catchments (ha)
Conversion Factor
olved by trial and error using the three equations below as per IECA 2008.
Equation 2 (IECA 2008)
Peak flow rate (m3/s) of average recurrence interval (ARI) of Y years Drainage Design Standard for Temporary Drainage Works (as per Table A1 of IECA, 2008)
Mannings coefficieint (unitless) Operational Design Life
Cross sectional area of flow (m2), refer to Eqaution 3 Location < 12 months
Hydraulic Radius (m), refer to Equation 4 QLD, NT, northern WA 1 in 2 year
Slope of energy line, equal to slope of chanel bed (m/m) NSW, VIC, TAS, SA, southern WA 1 in 5 year
Note:
Equation 3 (IECA 2008) If temporary drainage structure located immediately upslope of an occupied property that would be
adversely affected by the failure or overtopping of the structure adopt a minimum of 1 in 10 year design
Cross sectional area of flow (m2) Temporary culvert crossing shall adopt a minimum of 1 in 1 year hydraulic capacity
Base width of channel (m) Figure 1 Cross-section of Chute Minimum 150mm freeboard additional to design capacity
side slope of channel
depth of flow in channel (m) + required 0.15m freeboard
Frequency Factor (as per Table A7 of IECA, 2008)
Equation 4 (IECA 2008)
side slope of channel
depth of flow in channel (m) + required 0.30m freeboard
Property of O2 Environment + Engineering. Use of this spreadsheet is at the users risk.
O2 Environment + Engineering waives all liability to any third party loss, damage, liability or claim
arising out of using or relying on the calculations, results or output of this spreadsheet.
Peak Flow Calcs Velocity
INPUTS OUTPUTS Inputs Outputs
Channel Maximum
Base Width Side Slope Channel Flow Depth with Permissable Velocity
Q5 (m) Length Slope (m/m) Proposed Lining Mannings Peak Flow Flow Depth (m) 150mm Feeboard (m/s) Velocity (m/s)
C10 Itc,y Tc A F b x So n Q y Vmax V
Refer Aquaintel SMP 0.153 0.6 2 0.029 Geofabric 0.0220 0.153 0.119 0.269 1.500 1.534
0.7 203 5 0.1 0.95 0.037 1.2 2 0.250 Geofabric 0.0220 0.037 0.019 0.169 1.500 1.594
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.