Original source · versioned page text
24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawny Drainage Works (as per Table A1 of IECA, 2008)
Operational Design Life
12 - 24 months > 24 months
1 in 5 year 1 in 10 year
1 in 10 year 1 in 10 year
ediately upslope of an occupied property that would be
ing of the structure adopt a minimum of 1 in 10 year design standard.
nimum of 1 in 1 year hydraulic capacity
Rock Check Dam Assessment
Inputs Outputs
Upstream Minimum Corss Section
water level Height with Area Flow Velocity
Wier Base width Horizontal relative to 0.15m Across Wier across wier
(m) Slope of Wier Wier (m) Freeboard (m) (m^2) (m/s)
b m H H + freeboard A V
1.270 1.420 0.000 #DIV/0!
1.270 1.420 0.000 #DIV/0!
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.