24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Transition layer (coarse sand)
installed to correct depth (+ 25 mm)
Placement of filter media completed
to avoid compaction of media and
using at least two lifts
Filter media installed to correct
depth
Light, even compaction applied to
remove air gaps (e.g. light roller or
single pass with a ‘pozitrack’
bobcat)
Spreader bar used to flatten surface
of filter media

Sediment fences in place

INSPECTION: Superintendent and bioretention designer inspection and sign-off to occur while installation of
media is occurring. Photos must be taken by the superintendent, the bioretention designer or the contractor.

Comments (attach and refer to additional pages if necessary)




NB: Laboratory test results, certification, delivery dockets and photos attached.


Signed by superintendent:
Print name:
Date:
AND
Signed by bioretention designer:
Print name:
Date:
FORM D — Finished Levels

Purpose: To ensure finished levels of system surface and bunds are correct and meet the design.

Items                                   Checked                Satisfactory             Action (if unsatisfactory)          Initial

Landscaping topsoil applied to
surrounding bunds to achieve
design levels
As-constructed survey of system
surface and surrounding bunds
completed

                              CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – BIORETENTION
                                                                                  SYSTEMS                                       7

                                                               © South East Queensland Healthy Waterways Partnership 2010
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.