Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Final constructed levels are
consistent with design levels
Under-drainage clean-outs
extended 50–150 mm above filter
media
Under-drainage pipes flushed to
remove initial ingress of material

HOLD POINT: Superintendent and bioretention designer inspection and sign-off before proceeding.

Comments (attach and refer to additional pages if necessary)




NB: As constructed survey and drawings and photos attached.


Signed by superintendent:
Print name:
Date:
AND
Signed by bioretention designer:
Print name:
Date:
FORM E — Coarse Sediment Forebay

Purpose: To ensure the coarse sediment forebay is constructed correctly.

                                                                                             Action (if
Items                                  Checked                  Satisfactory                                                Initial
                                                                                             unsatisfactory)
Extent of coarse sediment forebay
correctly set out
Rocks to be used to line base of
forebay are correct size and shape
Base of constructed forebay is flat
and set at the correct level below
the surface of the filter media



                                CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – BIORETENTION
                                                                                    SYSTEMS                                     8

                                                               © South East Queensland Healthy Waterways Partnership 2010
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.