Skip to the record
The gold standard in government transparency.

Original source · versioned page text

24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Waste Management Plan
Job No. 24647 - 71 Seaview Terrace Sunshine Beach Qld 4567




Table 3: Australian Standards Relevant to Waste

 Australia Standards                   Objective
 AS 1940:2004                          The storage and handling of flammable and combustible liquids
 AS 1216:2006                          Class labels for dangerous goods
 AS 3780:1994                          The storage and handling of corrosive substances
 AS4123.7 2006                         Bin Colours, markings and designation requirements




    4. RESPONSIBILITIES
The Site Manager and Site Supervisors are responsible for on-site activities and ensuring the management strategies
outlined in this EMP and related documents are implemented correctly, and monitoring performance indicators.
All project personnel and subcontractors are responsible for familiarising themselves with the requirements of this EMP
and related site management documents. Training requirements are outlined in the EMP Section 2.1. On-site
Environmental Responsibilities.

Table 4 identifies the Project team’s environmental responsibilities during construction.

 Title                  Name and Contact           Responsibilities
                        Details
 Project Manager        Jarod Dingle
                                                    Overall project environmental management and due diligence
                        0419 762 381
                                                    Ensure that all third party waste contractors are licensed (as
                                                     appropriate)

                                                    Community and Regulator liaison.

 Team HSE               Cameron McAndrew
                                                    Ensure project objectives for waste management are in line with
 Manager                0401 983 107                 company and legislative requirements

                                                    Approve Waste Management Plan

                                                    Organise adequate resources for environmental awareness training
                                                     regarding waste management for personnel where required

                                                    Ensure that statutory reporting to the administering authority is
                                                     performed where required
                                                    Monitor that site waste is managed in a manner that takes into account
                                                     health, safety and environmental issues

 Site Manager           Matt Leeke
                                                    Implement the waste management plan
                        0414 691 314
                                                    Approval of any chemicals entering the site

                                                    Compliance with permits, local council guidelines and regulatory
                                                     requirements

                                                    Ensure all waste bins are correctly labelled and stored in the
                                                     appropriate designated area for that waste

                                                    Ensure waste storage facilities, transporters and treatment or disposal
                                                     sites have the appropriate licenses to handle all waste streams
                                                     relevant to their activities




HUTCHINSON BUILDERS                                                                                                           8
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.