24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Waste Management Plan
Job No. 24647 - 71 Seaview Terrace Sunshine Beach Qld 4567


 Title                  Name and Contact         Responsibilities
                        Details
 HSE Advisor            Terry Strahan
                                                  Direct activities in accordance with this waste management plan and
                        0419 762 427               related documents.
                        Jesse Joyce
                        0403 745 840              Communicate any changes to plan and related documents to site
                                                   personnel

                                                  Ensure that project personnel, including visitors are appropriately
                                                   inducted and are aware of their environmental obligations

                                                  Provide or arrange appropriate training if required
                                                  Ensure that waste transport companies have completed waste
                                                   certificates prior to waste transporting and copies are retained
                                                   appropriately

                                                  Ensure that any incidents, observations or corrective actions that may
                                                   occur during waste storage and/ or handling events are reported as
                                                   per company procedure.

                                                  Ensure that all Waste Transportation Certificates are submitted to EHP
                                                   within the statutory timeframes

                                                  Ensure Weekly HSE Inspection – Big 8 HB-HSEQ-F-048 are being
                                                   completed

                                                  Monitoring of performance of this waste management plan.

 Sub-contractors        As engaged
                                                  Ensuring their areas of control, works and associated personnel
                        (Refer to Sub-
                                                   comply with the requirements of this waste management plan and
                        contractors Contact
                        List)                      related documents.

 Waste Contractor       Suncoast Skips
                                                  Removal of waste bins as per contractual requirements (at least
                        1800 239 594               monthly)

                                                  Off-site segregation / recycling of wastes

                                                  Reporting on monthly % reuse/recycle targets where required



    5. TRAINING
All employees and sub-contractors will attend a site specific site induction that will outline environmental controls to be
implemented on the project. Requirements of the Environmental Work Method Statement: 02 Waste Management shall
be communicated. Management staff shall be made aware of the environmental objectives and targets, commitments and
procedures for waste minimisation. Work practices that minimise generation of wastes will be promoted and used on site.
To increase waste management awareness on-site, signs advertising good waste management principles will be displayed
throughout the work site where appropriate.


    6. METHODS OF MANAGEMENT OF WASTE

6.1.          WASTE MANAGEMENT PRINCIPLES
The waste management hierarchy is a nationally and internationally accepted guide for prioritising waste management
practices with the objective of achieving optimal environmental outcomes. It sets out the preferred order of waste
management practices, from most to least preferred.
This plan has been developed using the waste management hierarchy principals: Avoid – Reduce - Re-use- Recycle –
Dispose.




HUTCHINSON BUILDERS                                                                                                        9
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.