24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnWaste Management Plan
Job No. 24647 - 71 Seaview Terrace Sunshine Beach Qld 4567
Using
Using less
less material
material in
in design
design and
and manufacture.
manufacture. Keeping
Keeping
Prevention products
products for
for longer;
longer; re
re use.
use. Using
Using less
less hazardous
hazardous
materials
materials
Checking,
Checking, cleaning,
cleaning, repairing,
repairing, refurbishing,
refurbishing, whole
whole items
items
Reduce
or
or spare
spare parts
parts
Every
Every effort
effort will
will be
be made
made to to ensure
ensure that
that waste
waste
Reuse material
material isis seen
seen as
as aa resource
resource and
and isis used
used
Turning
Turning waste
waste into
into aa new
new substance
substance or
or product.
product.
Recycle
Includes
Includes composting
composting ifif itit meets
meets quality
quality protocols
protocols
Disposal Landfill
Landfill and
and incineration
incineration without
without energy
energy recovery
recovery
Figure 1: Waste Hierarchy Decision Process
6.1. 1 Waste Prevention Principles
Waste prevention principles to be adopted:
When assessing design options, consideration shall be given to options that have higher waste reduction than
the alternatives (if economical to do so);
When assessing construction options, consideration shall be given to options that have higher waste reduction
than the alternatives (if economical to do so);
When purchasing for the project, consideration shall be given to either reduce or avoid the generation of waste;
and
Aim to accurately estimate and order quantities of materials required.
6.1. 2 Waste Reduce Principles
Waste reduction principles to be adopted:
Material substitution for a less resource intensive product or service (generation) and reduce waste (disposal)
Avoid disposable products (e.g. polystyrene cups) and buy bulk supplies.
Recycle aluminium, glass and plastic drink containers.
Avoid generating excess waste by using e-mail as much as possible, circulating one copy of a memo and have
people sign it after reading, and editing rough drafts on computer.
Reduce paper waste by photocopying double sided, printing double sided or using singled sided waste again as
notepaper or for drafts
Reuse old binders, file folders, report covers and general office equipment
6.1. 3 Waste Reuse Principles
Every effort will be made to ensure that waste material is seen as a resource and is used, either on-site within the project
or off-site either on other projects or by other persons. Waste reuse principles adopted are:
Identifying materials for a reuse purpose;
Segregated materials at the source of generation to facilitate reuse if economical to do so; and
Storing or reusing those items either on-site or off-site, during the process if economical to do so.
Waste Recycling Principles:
HUTCHINSON BUILDERS 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.