Skip to the record
Every meeting, every word.

Original source · versioned page text

24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
List of Referenced Legislation & Codes of Practice – Environment
HB-HSEQ-F-005-A Version 5
           Issues             Applicable Legislation / Guidelines / Standards    Regulating                      Major Requirements Of Legislation
                                                                                  Authority

 Vegetation clearing or      Protection of the Environment Operations Act 1997   NSW EPA         General duty of care to prevent environmental harm through pollution.
 disturbance                 Native Vegetation Act 2003                                          Relevant approvals should have been obtained by any clients
                                                                                                  authorizing clearing.
                                                                                                 Do not undertake any clearing without first obtaining permission from the
                                                                                                  site manager AND checking that the relevant approvals have been
                                                                                                  obtained.
                                                                                                  If in doubt, obtain advice from relevant council about whether any
                                                                                                  clearing restrictions or approvals may apply.
                                                                                                 Fencing may be required to protect vegetation.
                                                                                                 Methods to reduce ground compaction, root damage or modification of
                                                                                                  the site conditions near vegetation may be required.
 Native Fauna                Native Vegetation Act 2003                          NSW EPA         All fauna is protected under the Act (including common animals)
                                                                                                 Do not injure or harm animals that may be in the way of works.
                                                                                                 Ensure that measures to avoid injury to native wildlife have been
                                                                                                  considered if necessary.
                                                                                                 During clearing of vegetation it may be necessary to have spotter-
                                                                                                  catchers on site to remove animals.
                                                                                                 Hollow dwelling animals may be within tree trunks and logs.
                                                                                                 Leave snakes alone unless they are an absolute threat to your safety.
 Weed management             Noxious Weeds Act 1993                              NSW EPA         Pest management laws define different classes of declared weeds and
                                                                                                  required management strategies for each. It is illegal to introduce certain
                                                                                                  classes of declared plants (I.e. there is a legal obligation to prevent
                                                                                                  weed spread).
                                                                                                 Must wash down vehicles to prevent the spread of weeds between
                                                                                                  areas
                                                                                                 Ensure all vehicles/equipment are clean on arrival at the site.
                                                                                                 If weeds are present, on leaving the site it will be necessary to wash
                                                                                                  down the vehicle to avoid spread of declared weeds to another site.
                                                                                                 Follow Department of Natural Resources Management guidelines for
                                                                                                  vehicle wash down or visit an approved wash down centre.
 Heritage Issues
 Protected Areas / Parks /   National Parks & Wildlife Act 1974                  NSW EPA         Check with relevant authority for permit requirements prior to
 Scientific Areas                                                                                 investigation works in World Heritage areas, National Heritage places
                                                                                                  and Wetlands of international importance




HUTCHINSON BUILDERS                                                                                                                                                        15
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.