24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Environmental Management Plan
24647 – 71 SEAVIEW TCE SUNSHINE BEACH


Preface
Hutchinson Builders has developed this Environmental Management Plan (EMP) as the appointed Principal Contractor.
This plan provides specific information regarding the management of project-related works and will ensure that a uniform approach to
environmental management is adopted.
A copy of the plan (EMP) shall be referenced in Hutchinson Builders site specific induction and will be held on site by Hutchinson
Builders so that all site employees, Client Reps, Subcontractors have access to the plan at all times. This plan is to be reviewed at 3
monthly intervals or amended where deficiencies are identified, or changes occur in Hutchinson Builders’ Environmental Management
System or project works change such that the information contained in the plan is no longer accurate or valid. If this EMP is altered it
will be the Team Leaders / Team HSE Managers responsibility to ensure that the revised EMP is distributed to all Hutchinson Builders
Site Management Staff, Client Representatives, Site Employees and Sub-contractors associated with the work.
Plan Review:

  Name                                Position                                          Signature
  Michael Michell                     Team Leader


  Jarod Dingle                        Project Manager


  Cameron McAndrew                    Team HSE Manager


  Matt Leeke                          Site Manager


  Terry Strahan                       Foremen


  Jesse Joyce                         Foreman




Plan Revision:

  Revision Number                     Review Date                                       Person Reviewing

  1                                       28/07/2016                                    Cameron McAndrew




HUTCHINSON BUILDERS                                                                                                                  4
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.