24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnEnvironmental Management Plan 24647 – 71 SEAVIEW TCE SUNSHINE BEACH Preface Hutchinson Builders has developed this Environmental Management Plan (EMP) as the appointed Principal Contractor. This plan provides specific information regarding the management of project-related works and will ensure that a uniform approach to environmental management is adopted. A copy of the plan (EMP) shall be referenced in Hutchinson Builders site specific induction and will be held on site by Hutchinson Builders so that all site employees, Client Reps, Subcontractors have access to the plan at all times. This plan is to be reviewed at 3 monthly intervals or amended where deficiencies are identified, or changes occur in Hutchinson Builders’ Environmental Management System or project works change such that the information contained in the plan is no longer accurate or valid. If this EMP is altered it will be the Team Leaders / Team HSE Managers responsibility to ensure that the revised EMP is distributed to all Hutchinson Builders Site Management Staff, Client Representatives, Site Employees and Sub-contractors associated with the work. Plan Review: Name Position Signature Michael Michell Team Leader Jarod Dingle Project Manager Cameron McAndrew Team HSE Manager Matt Leeke Site Manager Terry Strahan Foremen Jesse Joyce Foreman Plan Revision: Revision Number Review Date Person Reviewing 1 28/07/2016 Cameron McAndrew HUTCHINSON BUILDERS 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.