Skip to the record
Accept no substitutions.

Original source · versioned page text

24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Environmental Management Plan
24647 – 71 SEAVIEW TCE SUNSHINE BEACH


Glossary


 Term                     Definition
 C.A.R.                   Corrective Action Report
 Consequence              The outcome of an event expressed qualitatively or quantitatively, being a loss, injury,
                          disadvantage or gain
 Control Method           Method available to facilitate compliance with the performance criteria
 Corrective Action        Action taken to eliminate the cause of a non-conformance, defect or short-coming
 EMP                      Environmental Management Plan
 EMSM                     Environmental Management Systems Manual
 Environmental Aspects    Any element of an organisation’s activities, products or services that can interact with the
                          environment
 Environmental Impact     Any change in the environment whether adverse or beneficial, wholly or partially resulting from
 Environmental Issue      organisation activities, products or services
                          A term used by the Company to address both environmental aspects and impacts.
 EPA                      Environment Protection Authority
 ERP                      Emergency Response Procedure
 EWMS                     Environmental Work Method Statement
 HSE                      Health Safety and Environment
 Likelihood               A qualitative description of probability or frequency
 NATA                     National Association of Testing Authorities
 PM                       Hutchinson Builders Project Manager
 PPE                      Personal Protective Equipment
 PRA                      Project Risk Assessment
 SDS                      Safety Data Sheet
 SM                       Hutchinson Builders Site Manager
 WHSMP                    Work Health & Safety Management Plan




HUTCHINSON BUILDERS                                                                                                        5
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.