Original source · versioned page text
24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnList of Referenced Legislation & Codes of Practice – Environment
HB-HSEQ-F-005-A Version 5
Issue Applicable Legislation / Regulating Authority Major Requirements of Legislation
Guidelines / Standards
Location of Under Ground Electricity Commission Act 1981 NT NT Government If excavating in a public place, suitable means must be used to
Services identify any electrical cables that could be present.
Call Dial Before You Dig. This organisation will advise if electrical
cables owned by one or more of its contributory members are
located near your worksite. In addition, definite cable locations
can be determined by special arrangement with the
organisations.
Contact relevant authorities about any cables they may have
placed near the excavation. Authorities may include:
o Distribution entities
o Communication companies
o Local government authorities
o Water authorities (typically to supply water metering
equipment).
In some instances, customers of distribution entities have
authority to place electricity cables in public places. If excavating
on private property, you should first contact the owner or
occupier of the premises about buried cables.
Location of Above Ground Electricity Commission Act 1981 NT NT Government Greater than 3m clearance required for power lines on timber
Services poles. Greater than 8m clearance required for other power lines.
Inside these distances require inspection by authorised
personnel
Exclusion zone required for operation of plant near live electric
lines.
Noise and Vibration
Sensitive Receptors Noise Guidelines for the development sites in NT EPA Minimise the effects of noise on adjacent environmental values,
the Northern Territory including neighbours, unless authorised by an Environmental
Authority Development Approval.
AS/NZ 2436:1981 "Guide to Noise Control on Australia Standards Methods for sound measurement and the control of noise are
Construction, Maintenance and Demolition outlined
sites". Guidelines provided for hearing protection
Noise Thresholds / Hours of Waste Management and Pollution Control Act NT EPA Work Hours on Building sites are Mon-Sat 6.30am-6.00pm,
Operation NT except where prior approval has been obtained (e.g. from local
council).
Local Council Laws No work is permitted on Sundays and Public Holidays.
Local regulations should also be followed.
Soil Management
HUTCHINSON BUILDERS 49
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.