24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnList of Referenced Legislation & Codes of Practice – Environment
HB-HSEQ-F-005-A Version 5
Issue Applicable Legislation / Regulating Authority Major Requirements of Legislation
Guidelines / Standards
Erosion and sediment control Soil Conservation and Land Utilization Act NT NT EPA Local council can develop environmental plans to manage
Water Act NT erosion and sediment erosion issues. Check with the appropriate
local council for further details Must not deposit sand, soil, silt or
mud—
Erosion and Sediment Control Guidelines - Built Department of Land
Environment NT Resource Management - in a roadside gutter, stormwater drain or a water; or
Land Clearing Guidelines NT (DLRM) - in a place where it could move or be washed into a roadside
gutter, or stormwater drain
IECA Local council can develop environmental plans to manage
erosion and sediment erosion issues. Check with the appropriate
Best Practice Erosion & Sediment Control 2008 local council for further details
Minimisation of erosion and control of sediment in all
construction activities.
Use of erosion control matting to minimise soil erosion on steep
slopes and for highly erosive soils.
Stabilised entry and exit points to minimise tracking of sediment
offsite.
Sediment control for service trenches.
Preserve as much soil cover (grass, leaf litter, gravel and erosion
control mats) as possible.
Maintain kerb vegetation where practicable to filter out sediment
Commence earthworks immediately prior to building.
Topsoil should be stockpiled (with cover) for later use.
Building materials should be located within the sediment control
zone.
A perimeter bank may be required upslope of a stockpile.
Acid Sulfate Soils State Planning Policy (SP2/02) Guideline for NT Government Correct management of acid sulphate soils (ASS). See ASS
Planning and Managing Development Involving Management Plan if provided.
Acid Sulfate Soils
Queensland Acid Sulfate Soil Techical Manual –
Soil Management Guidelines v4.0
Fire ants http://www.nt.gov.au/d/Primary_Industry/ Department of Land The Red-imported fire ant is not established in the Northern
Resource Management Territory, but is a significant threat because it prefers tropical
Department of Primary conditions
Industry and Fisheries Any movement of Restricted items will require record of receipts/
delivery dockets
DO NOT bring pot-plants from Queensland unless correctly
certified
Waste Management
HUTCHINSON BUILDERS 50
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.