Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Environmental Management Plan
24647 – 71 SEAVIEW TCE SUNSHINE BEACH


2.             Introduction

2.1            Purpose
This Environmental Management Plan (EMP) was developed by Hutchinson Builders to identify and provide management solutions
for potential environmental impacts arising from the construction of insert job name and address here.
The aim of this EMP is to provide the framework for environmental management of the construction phase of the project.
It is the responsibility of all project personnel, contractors and subcontractors to comply with the objectives and requirements of this
EMP and related documents.
Specifically this document:

    Sets the environmental objectives or standards to be achieved

    Identifies relevant legal requirements and conditions of approval

    Identifies environmental aspects of the construction activities and the potential environmental impacts which may result

    Details measures to mitigate potential environmental impacts and protect any special environmental characteristics of the site

    Identifies extraordinary factors (i.e. natural disasters, emergencies) that may cause environmental impacts and describes
     contingency plans to deal with these

    Describes strategies to ensure site personnel are aware of the environmental risks associated with the activity, and are trained in
     the measures and contingency plans to deal with them

    Details the monitoring and review program to evaluate environmental performance and ensure the effectiveness of environmental
     controls and contingency plans
    Describes the activities organisational structure and environmental responsibilities of site personnel including sub-contractors

    Outlines the mechanisms for communication of environmental information throughout the organisation and other stakeholders

    Describes the response and reporting procedure for complaints

    Details the requirements for record keeping

    Provides for continual improvement.

2.1.1          Environmental Commitment

Hutchinson Builders and their staff are committed to a ensuring a high standard of responsible environmental management during the
Project.
Hutchinson Builders are committed to:

    Reducing the risk of adverse environmental impacts through an ongoing process of hazard identification, risk assessment, control
     implementation, monitoring and review;

    Minimising the potential for disturbance and disruption to surrounding stakeholders, including residents, businesses and the public;

    Striving for continuous improvement through ongoing environmental performance evaluation against Environmental Work Method
     Statements (EWMS), three monthly auditing, and ongoing update and review of this EMP;

    Sustainable procurement; and

    Complying with all relevant regulatory, local laws and planning requirements.

2.1.2          Objectives of this Environmental Management Plan
The objectives of this EMP are to:

    Minimise the potential for adverse environmental impacts arising from construction activities;

    Outline the mitigation measures to ensure environmental risks are adequately managed during construction;
    Ensure all activities comply with relevant local and State regulatory requirements; and

    Ensure all activities comply with any environmental conditions of approval or permits.



HUTCHINSON BUILDERS                                                                                                                    7
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.