Original source · versioned page text
24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnMCU14/0084 Plan No. Rev. Plan, prepared by Date SK 02.02 P1 Survey Plan, prepared by NRA 23.10.2014 SK 03.01 P1 Level 1 Floor Plan, prepared by NRA 23.10.2014 SK 03.02 P1 Level 2, prepared by NRA 07.10.2014 SK 03.03 P1 Level 3 Floor Plan, prepared by NRA 23.10.2014 SK 05.01 P1 Section 1, prepared by NRA 07.10.2014 SK 05.02 P1 Section 2, prepared by NRA 07.10.2014 SK 05.03 P1 Section 3, prepared by NRA 07.10.2014 SK 05.06 P1 3D Views, prepared by NRA 07.10.2014 Building Height 3. The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground surface and 2 storeys. 4. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. Performance Bond 5. Security in the form of a cash bond or trading bank guarantee to the sum of $40,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Built Form 6. The proposal must incorporate a green roof as indicated on the approved plans. Setbacks 7. Earth mounding for the green roof must not exceed 1m above the natural ground level within the southern boundary setback area. 8. The combined height of the block wall and the beam on top of the contiguous piles along the western boundary must not exceed 1m above the natural ground level. 9. The building must be setback 6m from the southern boundary, except for construction elements such as contiguous piling and the ‘dry zone’ which must be setback a minimum of 1.5m at the light court. The contiguous piling and the ‘dry zone’ to the east and west of the light court must be setback in accordance with the approved plans. Landscaping 10. All landscaping works must be undertaken in accordance with an Operational Works approval and Planning Scheme Policy PSP3 Landscaping Plants and Guidelines. A landscape plan prepared by a suitably qualified person must be submitted and include in particular: a. further detail on the ‘green roof’ specific for the development b. area of the roof that is proposed ‘green’ and areas that are proposed off form concrete Page 2 of 11 Document Set ID: 19879056 Version: 1, Version Date: 16/03/2015 Print Date: 16 March 2015, 2:32 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.