Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                          MCU14/0084


                            Plan No.         Rev.     Plan, prepared by                                Date
                            SK 02.02         P1       Survey Plan, prepared by NRA                     23.10.2014

                            SK 03.01         P1       Level 1 Floor Plan, prepared by NRA              23.10.2014

                            SK 03.02         P1       Level 2, prepared by NRA                         07.10.2014

                            SK 03.03         P1       Level 3 Floor Plan, prepared by NRA              23.10.2014

                            SK 05.01         P1       Section 1, prepared by NRA                       07.10.2014

                            SK 05.02         P1       Section 2, prepared by NRA                       07.10.2014

                            SK 05.03         P1       Section 3, prepared by NRA                       07.10.2014

                            SK 05.06         P1       3D Views, prepared by NRA                        07.10.2014

                          Building Height
                  3.      The maximum height of the development must not exceed 8 metres above the finished
                          ground level and the natural ground surface and 2 storeys.
                  4.      Certification must be submitted to Council from a Licensed Surveyor which certifies that
                          the building does not exceed the maximum height requirement of this Decision Notice.
                          Performance Bond
                  5.      Security in the form of a cash bond or trading bank guarantee to the sum of $40,000
                          must be submitted to Council, to secure performance of all conditions of this approval,
                          prior to the issue of a Development Permit for Operational Works. The cash bond or
                          trading bank guarantee will be returned on performance of the conditions of approval less
                          any costs incurred by Council in respect of enforcing performance of this permit. Council
                          reserves the right to call upon the bond or guaranteed sum to effect compliance with
                          conditions.
                          Built Form
                  6.      The proposal must incorporate a green roof as indicated on the approved plans.
                          Setbacks
                  7.      Earth mounding for the green roof must not exceed 1m above the natural ground level
                          within the southern boundary setback area.
                  8.      The combined height of the block wall and the beam on top of the contiguous piles along
                          the western boundary must not exceed 1m above the natural ground level.
                  9.      The building must be setback 6m from the southern boundary, except for construction
                          elements such as contiguous piling and the ‘dry zone’ which must be setback a minimum
                          of 1.5m at the light court. The contiguous piling and the ‘dry zone’ to the east and west of
                          the light court must be setback in accordance with the approved plans.
                          Landscaping
                  10.     All landscaping works must be undertaken in accordance with an Operational Works
                          approval and Planning Scheme Policy PSP3 Landscaping Plants and Guidelines. A
                          landscape plan prepared by a suitably qualified person must be submitted and include in
                          particular:
                          a.      further detail on the ‘green roof’ specific for the development
                          b.      area of the roof that is proposed ‘green’ and areas that are proposed off form
                                  concrete
                                                                                                        Page 2 of 11

Document Set ID: 19879056
Version: 1, Version Date: 16/03/2015                                                                 Print Date: 16 March 2015, 2:32 PM
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.