Original source · versioned page text
24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnMCU14/0084 c. species list and density of plantings d. incorporation of screening plants along the southern boundary adjacent to the light court and stairs 11. Existing trees on site must be retained, except where required to be removed to accommodate the approved dwelling. In this regard, the removal of vegetation must not extend beyond 3m of the building footprint. 12. No clearing is permitted within the Open Space Conservation zone. 13. All trees being retained and the Open Space Conservation zone must be protected from clearing or construction activities by: a. clearly delineating the Open Space Conservation zone boundary with protective fencing b. clearly marking vegetation to be retained with flagging tape c. installing protective fencing around the drip line of the vegetation d. restricting stockpiling, storage and vehicle parking to those areas which are already cleared e. using low impact construction techniques around vegetation. Coastal Protection 14. External colours and finishes of the building must comprise muted/environmental tones that blend with the natural environment. Vehicle Access 15. The construction and associated activities (deliveries, parking, etc.) must not impede the legal use of the access handle by any benefitted property or person. Construction 16. A Condition Survey must be carried out on adjoining buildings, structures and services prior to any demolition, excavation or construction works taking place on site. If distress already exists, a photographic survey should be undertaken, the distress measured and a plan to monitor changes to distress must be implemented. Copies of these surveys must be submitted to Council for its records. 17. A Construction Management Plan for the development must be submitted to and approved by Council at least 5 working days prior to the commencement of any Building works or at least 5 working days prior to the pre-start meeting for Operational Works. The Construction Management Plan shall include but not be limited to: a. site working hours b. communication and consultation processes with surrounding premises. c. control and suppression of – (i) noise (ii) vibration; (iii) dust; (iv) odours and exhausts control; and (v) site working hours d. employee and contractor induction and education processes. 18. A Traffic Management Plan for each separate construction phase of the development must be submitted to and approved by Council at least 5 working days prior to the commencement of any works or at least 5 working days prior to the pre-start meeting for Operational Works. The Traffic Management Plan must include but not be limited to: a. limiting the routes for the heavy vehicles to the major road network and define the route to the site Page 3 of 11 Document Set ID: 19879056 Version: 1, Version Date: 16/03/2015 Print Date: 16 March 2015, 2:32 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.