Log in to see the plans as drawnPerformance Outcomes Acceptable Outcomes
PO20 AO20.1
Development on sloping sites: To protect scenic amenity and other landscape qualities,
(a) is visually responsive to the natural topography and sits buildings and structures are not constructed on land with a slope
within the landscape rather than dominating it; greater than 33% and on steep slopes are only constructed if:
(b) steps down slopes or uses suspended floor construction, (a) there are no other suitable building sites on the property;
minimising cut or fill and avoiding benching of the site; and
(c) retains natural vegetation that assists in screening or (b) using suspended floors or pole footings rather than slab on
visually softening development; and ground construction.
(d) uses materials, finishes and colours that complement the
AO20.2
natural setting and integrate with the landscape and
On sloping sites or on ridgelines at the uppermost edge of a hill
skyline.
slope:
(a) roof lines are generally parallel with contours of the land;
(b) roofs do not exceed a pitch of 15 degrees;
(c) buildings do not protrude above the height of prevailing
vegetation; and
(d) undercroft areas exceeding 1.5 metres in height are
screened with landscaping or battens.
Editor's note—refer to Figure AP33B
AO20.3
On sloping sites slab on ground construction is avoided to
minimise building bulk and benching of the site. Splitlevel
buildings with small floorplates are used as an alternative. Post
and beam construction or suspended floor or pole footings may
be appropriate.
Editor's note—refer to Figure 6.9.1A and Figure 6.9.1B
AO20.4
Buildings:
(a) are constructed in lightweight materials such as timber or
board, stainless steel, glass and corrugated iron;
(b) are finished with exterior colours of moderate to darker
shades of olive green, brown, green, blue, charcoal or
wood stains that blend with the colour and hues of the
surrounding vegetation and landscape;
(c) avoid large expanses of solid colours or reflective surfaces.
Earthworks and drainage Table 6.3.1.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Earthworks and drainage
**FINAL DRAFT Post Consultation 2019**
Page 12 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.