Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version
The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance Outcomes Acceptable Outcomes
PO21 AO21
Filling and excavation for operational works do not directly, Filling and excavation for operation works are designed and
indirectly or cumulatively cause adverse impacts external to the constructed to ensure overland flow and/or flooding is not
development site by: worsened, impeded, or otherwise diverted to adversely affect other
(a) causing ponding of water on the site or nearby land; properties or downstream environments.
(b) increasing flooding, which adversely affects the safety or
use of any land upstream or downstream; or
(c) adversely affecting the flow of water in any overland flow
path.
Figure 6.3.1.4 Setbacks
Figure 6.3.1.5 Noosa Waters Setbacks from Revetment wall
**FINAL DRAFT Post Consultation 2019**
Page 13 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.