Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance Outcomes                                                 Acceptable Outcomes
PO24
Buildings and other structures present a high quality streetscape    No acceptable outcome provided
with design elements and building forms that:
(a)   define the street and public spaces;
(b)   provide a consistent building alignment fronting the street
      and public spaces;
(c)   contribute to the streetscape activity and vibrancy of the
      centre;
(d)   create pedestrian scale and visual interest;
(e)   contribute to their setting, including the skyline; and
(f)   provide areas for outdoor dining and meeting opportunities
      on the ground level.

PO25
Buildings on corner sites define the street intersection and         No acceptable outcome provided
include interesting or decorative features and design elements.

Editor's note—refer to figure AP3­7A
PO26                                                                   AO26
Development addresses the street and makes a positive                  Development:
contribution to the visual amenity and activation of the street during (a)  is designed and sited to activate and provide a positive
normal daytime trading hours.                                               contribution to the streetscape during daytime trading hours
                                                                           by incorporating architectural, landscape and furniture
                                                                           treatments which engage with the street;
                                                                     (b)   includes ground level building facades that avoid blank
                                                                           walls and security shutters and maintain a shopfront
                                                                           presence to the street.

PO27                                                              AO27
Uses on the ground floor are predominantly Business activities or Ground floor buildings provide a minimum of 50% transparent
Community activities accessible to the general public, including  glazing to shop fronts to create active building fronts.
but not limited to shops, restaurants, cafes, medical centres,
banks, post office, accountants or real estate agencies.
PO28                                                                 AO28
A mix of uses including outdoor sitting and dining areas are         Buildings address the street with main entrances fronting the
incorporated in the design to activate key street frontages and      street or outdoor squares or open plazas or laneways that
laneways.                                                            constitute the focal point of the centre, rather than to internal
                                                                     spaces or parking areas.

                                                                     Editor's note—refer to figure 6.4.4.4, figure AP3­8A and figure
                                                                     AP3­12A for design outcomes.
PO29
A consistent paving pattern, material and design i s to be adopted   No acceptable outcome provided
for outdoor public areas.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 11 of 30
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.