Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance Outcomes                                                   Acceptable Outcomes

Lighting
PO49                                                                   AO49.1
Lighting of appropriate intensities is provided to maximise safety.    Lighting of appropriate intensities is provided which satisfies the
                                                                       requirements of Australian Standard AS1158: Public Lighting
                                                                       Code unless otherwise specified in this Code.

                                                                       AO49.2
                                                                       External lighting of a graduated intensity is provided which starts
                                                                       at a lower level of brightness at the perimeter of the site and rises
                                                                       to a higher level at the entrance to buildings or at the centre of the
                                                                       site.

                                                                       AO49.3
                                                                       Lighting is directed onto the site and away from neighbouring
                                                                       properties.

                                                                       AO49.4
                                                                       In public and publicly accessible areas:
                                                                       (a)   lighting is vandal­resistant; and
                                                                       (b)   development incorporates solar lighting where possible.



                                                                       AO49.5
                                                                       Loading and storage areas are well lit or can be locked after
                                                                       hours.


Vehicle loading and waste
PO50                                                                   AO50
Vehicle loading / unloading and waste storage and collection           Vehicle loading/unloading, waste storage/collection and external
areas do not significantly impact on the visual or acoustic amenity    storage areas are enclosed within a service yard or courtyard and
of the area or sensitive landuses.                                     located to the rear or under the building and not located along any
                                                                       frontage to a public street or space.


Earthworks and Drainage                  Table 6.4.1.3 Criteria for assessment (part)
Performance Outcomes                                                   Acceptable Outcomes
Earthworks and Drainage
PO51                                                                   AO51
Filling and excavation does not directly, indirectly or cumulatively   Filling and excavation works are designed and constructed to
cause adverse impacts external to the development site by—             ensure overland flow and/or flooding is not worsened, impeded,
(a)   causing ponding of water on the site or nearby land;             or otherwise diverted to adversely affect other properties or
                                                                       downstream environments.
(b)   causing erosion or the transport of sediment off the site;
(c)   increasing flooding, which adversely affects the safety or
      use of any land upstream and downstream;
(d)   or adversely affecting the flow of water in any overland flow
      path.


Car parking and access                Table 6.4.1.3 Criteria for assessment (part)
Performance Outcomes                                                   Acceptable Outcomes
Car parking and access




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 18 of 30
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.