Log in to see the plans as drawnPerformance Outcomes Acceptable Outcomes
Lighting
PO49 AO49.1
Lighting of appropriate intensities is provided to maximise safety. Lighting of appropriate intensities is provided which satisfies the
requirements of Australian Standard AS1158: Public Lighting
Code unless otherwise specified in this Code.
AO49.2
External lighting of a graduated intensity is provided which starts
at a lower level of brightness at the perimeter of the site and rises
to a higher level at the entrance to buildings or at the centre of the
site.
AO49.3
Lighting is directed onto the site and away from neighbouring
properties.
AO49.4
In public and publicly accessible areas:
(a) lighting is vandalresistant; and
(b) development incorporates solar lighting where possible.
AO49.5
Loading and storage areas are well lit or can be locked after
hours.
Vehicle loading and waste
PO50 AO50
Vehicle loading / unloading and waste storage and collection Vehicle loading/unloading, waste storage/collection and external
areas do not significantly impact on the visual or acoustic amenity storage areas are enclosed within a service yard or courtyard and
of the area or sensitive landuses. located to the rear or under the building and not located along any
frontage to a public street or space.
Earthworks and Drainage Table 6.4.1.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Earthworks and Drainage
PO51 AO51
Filling and excavation does not directly, indirectly or cumulatively Filling and excavation works are designed and constructed to
cause adverse impacts external to the development site by— ensure overland flow and/or flooding is not worsened, impeded,
(a) causing ponding of water on the site or nearby land; or otherwise diverted to adversely affect other properties or
downstream environments.
(b) causing erosion or the transport of sediment off the site;
(c) increasing flooding, which adversely affects the safety or
use of any land upstream and downstream;
(d) or adversely affecting the flow of water in any overland flow
path.
Car parking and access Table 6.4.1.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Car parking and access
**FINAL DRAFT Post Consultation 2019**
Page 18 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.