Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version
Plans and drawings: the text below has words only, no drawings.
Very large file (15.6 MB): may take a few minutes to open.
Performance outcomes Acceptable Outcomes
PO7
In the localities of Tewantin and Cooroy, a food and drink outlet No acceptable outcome provided
does not incorporate a drivethrough facility.
PO8
Development is contained within the boundaries of the District No acceptable outcome provided
Centre zone with business growth consolidated on existing sites.
PO9 AO9.1
Development respects the fact that higher intensity retail uses are Within Tewantin:
concentrated in traditional core main streets and that at the edges (a) development in Diyan Street includes a mix of residential
of the District Centre zone lower intensity business and and entertainment and dining uses but does not include
community uses form a transition to residential uses. shops;
(b) development in Doonella Street and Blakesly Street include
mixeduse development incorporating small dwelling units
but does not include business uses such as shops which
rely on active frontages to Doonella Street or Blakesly
Street.
AO9.2
Within Cooroy, sites fronting Pearl Street, Kauri Street, do not
include shops or shopping centres or other uses that rely on
active frontages.
PO10 AO10
Short term accommodation is developed in conjunction with other Development incorporates nonresidential development in
centre uses, has proximity to tourist focused areas and is conjunction with shortterm accommodation in a mixeduse
accessible to visitors. format.
Mary Street/Thomas Street Health and Wellbeing Precinct
PO11
Uses: No acceptable outcome provided
(a) are low impact;
(b) are daytime use only if adjoining a residential zone; and
(c) do not include:
(i) a food and drink outlet or shop excluding where
located on Lot 1 RP802167; or
(ii) bar, hotel or nightclub entertainment facility.
Built form Table 6.4.2.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Built form
**FINAL DRAFT Post Consultation 2019**
Page 3 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.