Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (15.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
Performance outcomes                                                 Acceptable Outcomes
PO57                                                                 AO57.1
Development:                                                         Development does not result in sediment or other material
(a)   has minimal impact on the natural landform of the site;        including building materials or waste products being deposited or
                                                                     released into the road reserve, stormwater drain or adjacent
(b)   does not lead to erosion or the transport of sediments off
                                                                     properties.
      site;
(c)   does not lead to the disturbance of natural features,          AO57.2
      buildings or structures of cultural heritage significance; and Development on a site adjoining a local heritage place respects
(d)   does not visually impact on the cultural heritage              the cultural heritage significance of the place by mitigating any
      significance of the site .                                     adverse impacts on the setting or integrity of the heritage values.

                                                                     Editor’s Note— Local heritage places are identified on the
                                                                     Heritage and Character Areas overlay maps in schedule 2.
PO58
Uses are conducted in an environmentally responsible manner,    No acceptable outcome provided
operating without deleterious impacts on immediate, surrounding
or downstream communities, environments or environmental
processes.


Infrastructure         Table 6.4.2.3 Criteria for assessment (part)
Performance outcomes                                                 Acceptable outcomes

Infrastructure
PO59
Development is supported by adequate infrastructure and urban        No acceptable outcome provided
services including reticulated water, sewerage, stormwater
drainage, sealed roads, pathways and electricity and
telecommunication infrastructure.
PO60
Development does not adversely impact on the continued               No acceptable outcome provided
operation, viability and maintenance of existing infrastructure or
compromise the future provision of planned infrastructure.

Figure 6.4.2.4 ­ Pedestrian Environment ­ Street Awnings Cooroy




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 15 of 17
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.