Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (15.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
Performance outcomes                                                    Acceptable Outcomes
Vehicle loading and waste
PO53                                                                    AO53
Vehicle loading / unloading and waste storage and collection            Vehicle loading/unloading, waste storage/collection and external
areas do not significantly impact on the visual or acoustic amenity     storage areas are enclosed within a service yard or courtyard and
of the area or sensitive land uses.                                     located to the rear or under the building and not located along any
                                                                        frontage to a public street or space.




Earthworks and Drainage                  Table 6.4.2.3 Criteria for assessment
Performance outcomes                                                    Acceptable Outcomes
Earthworks and Drainage
PO54                                                                     AO54
Filling, excavation and retaining structures do not directly, indirectly Filling and excavation works are designed and constructed to
or cumulatively cause adverse impacts external to the                    ensure overland flow and/or flooding is not worsened, impeded,
development site by:                                                     or otherwise diverted to adversely affect other properties or
(a)     causing ponding  of water on  the site or nearby land;           downstream environments.

(b)   causing erosion or the transport of sediment off the site;
(c)   increasing flooding, which adversely affects the safety or
      use of any land upstream and downstream; or adversely
      affecting the flow of water in any overland flow path.


Pedestrian and Cycling Connectivity                      Table 6.4.2.3 Criteria for assessment (part)
Performance outcomes                                                    Acceptable Outcomes
Pedestrian and Cycling Connectivity
PO55
Convenient and legible connections are provided for pedestrians         No acceptable outcome provided
and cyclists to the site, particularly having regard to linkages with
existing and proposed public transport infrastructure, the open
space network, centres and other community­related activities.


PO56                                                                    AO56.1
Public or semi­public spaces are integrated into the centre's           Public and semi­public spaces are located to ensure pedestrian
pedestrian and cycle networks.                                          movement flows through the site and connects to the pedestrian
                                                                        and cycle networks.

                                                                        AO56.2
                                                                        Pedestrian arcades, laneways or enclosed thoroughfares are a
                                                                        minimum of 6 metres wide, provide a direct line of sight to a major
                                                                        pedestrian destination (major tenancy, car park, public place, etc.),
                                                                        and are not dead ends, narrow or circuitous.


Environment and heritage                 Table 6.4.2.3 Criteria for assessment (part)
Performance outcomes                                                    Acceptable Outcomes
Environment and heritage




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 14 of 17
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.