Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version
The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Industry Air Services
Aquaculture
Car wash
Extractive industry
Highimpact industry
Intensive animal industry
Intensive horticulture
Lowimpact industry
Major electricity infrastructure
Marine industry
Mediumimpact industry
Parking station
Research and technology industry
Renewable energy facility
Rural industry
Service industry
Substation
Transport depot
Utility installation
Winery
Warehouse
Other Animal husbandry
Animal keeping
Cropping
Homebased business
Landing
Market
Permanent plantation
Roadside stall
Telecommunications facility
Retail Adult store
Bar
Brothel
Food and drink outlet
Function facility
Hotel
Major sport, recreation and entertainment facility (convention centre
and exhibition centre)
Nightclub entertainment facility
Service Station
Shop
Shopping centre
Tourist attraction
Theatre
4.2.1 Population and employment growth
(1) A summary of the assumptions about population and employment growth for the planning scheme area is stated in Table
4.2.1 Population and employment assumptions summary.
Table 4.2.1 Population and employment assumptions summary
Column 1 Base Ultimate
Description date 2016 2021 2026 2031 development
Population 58,491 61,014 64,180 66,360 81,026
Employment 18,250 19,829 21,551 22,802 28,026
(2) Detailed assumptions about growth for each projection area and LGIP development type category are identified in the following
**FINAL DRAFT Post Consultation 2019**
Page 3 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.