Log in to see the plans as drawn tables in Schedule 3 Local government infrastructure plan mapping and tables:
(a) for population, Table SC3.1.1—Existing and projected population
(b) for employment, Table SC3.1.2—Existing and projected employees
4.2.2 Development
(1) The developable area is identified on Local Government Infrastructure Plan Maps LGIPPIASC1 to LGIPPIASC11 LGIP Priority
Infrastructure Area and Service Catchments in Schedule 3—Local government infrastructure plan mapping and tables.
The developable area is represented by zones relating to urban uses not affected by the following constraints:
Tenure
Landslip hazard
Slope
Biodiversity
Riparian vegetation
Waterways
Coastal hazards
Erosion prone areas
Heritage
Extractive resources
Split zoning – environmental management and conservation and recreation and open space zones
Land Uses existing park, environmental areas, car parks, cemeteries, clubs, community uses and utilities.
(2) The planned density for future development is stated in Table SC3.1.3 in Schedule 3—Local government infrastructure plan
mapping and tables.
(3) A summary of the assumptions about future residential and nonresidential development for the planning scheme area is stated
in Table 4.2.2—Residential dwellings and nonresidential floor space assumptions summary.
Table 4.2.2 Residential dwellings and nonresidential floor space assumptions summary
Column 1 Base Ultimate
Description date 2016 2021 2026 2031 development
Residential dwellings 29,963 31,278 33,281 34,681 43,579
Nonresidential floor 904,436 983,206 1,059,100 1,119,914 1,429,116
space (m² GFA)
(4) Detailed assumptions about future development for each projection area and LGIP development type are identified in the following
tables in Schedule 3 Local government infrastructure plan mapping and tables:
(a) for residential development, Table SC3.1.4
(b) for nonresidential development, Table SC3.1.5
4.2.3 Infrastructure demand
(1) The demand generation rate for a trunk infrastructure network is stated in Column 4 of Table SC3.1.3 in Schedule 3 Local
government infrastructure plan mapping and tables.
(2) A summary of the projected infrastructure demand for each service catchment is stated in:
(a) for the stormwater network, Table SC3.1.6
(b) for the transport network, Table SC3.1.7
(c) for the parks and land for community facilities network, Table SC3.1.8
4.3 Priority Infrastructure area
(1) The priority infrastructure area identifies the area prioritised for the provision of trunk infrastructure to service the existing and
assumed future urban development up to 2031.
(2) The priority infrastructure area is identified on Local Government Infrastructure Plan Maps LGIPPIASC1 to LGIPPIASC11 LGIP
Priority Infrastructure Area and Service Catchments.
**FINAL DRAFT Post Consultation 2019**
Page 4 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.