Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version
Plans and drawings: the text below has words only, no drawings.
Very large file (15.6 MB): may take a few minutes to open.
Performance outcomes Acceptable outcomes
Vehicle loading and waste
PO44 AO44
Vehicle loading / unloading and waste storage and collection Vehicle loading/unloading, waste storage/collection and external
areas do not significantly impact on the visual or acoustic amenity storage areas are enclosed within a service yard or courtyard and
of the site or it's surrounds. located to the rear or under the building and not located along any
frontage to a public street or open space.
Pedestrian and cycling connectivity
PO45 AO45
Areas used for community and recreation activities complement, Areas used for community and recreation activities are physically
and where practicable, are connected to open space or connected by a sealed pathway to other land in the Community
community uses. facilities zone, Recreation and Open Space zone and the
Environmental management and conservation zone within a
radius of 500 metres of the site.
PO46 AO46.1
Pedestrian safety and convenience is not threatened or reduced Car parking is not located forward of the front building line or front
by additional vehicular driveways. building setback and is screened from view from the street.
AO46.2
Provision is made for shared driveways to minimise the number
of driveways interrupting the flow of pedestrians along the
footpath.
Editor's note—refer to figure AP311A
for design outcomes for car parking.
PO47 AO47
Multi deck car parking is located and designed so that it is Car parking is sleeved with active land uses at street level where
effectively screened to street frontages at ground level with upper possible and include landscaping or design features at upper
floors to be landscaped or designed to have a good levels where visible from public spaces.
amenity when viewed from public spaces within and surrounding
the centre.
Earthworks and drainage Table 6.8.1.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes
Earthworks and drainage
PO48 AO48
Development and associated site works including filling, Development and associated site works, including filling and
excavation and retaining structures do not directly, indirectly or excavation, are designed and constructed to ensure overland flow
cumulatively cause adverse impacts external to the development and/or flooding is not worsened, impeded, or otherwise diverted to
site by: adversely affect other properties.
(a) causing ponding of water on the site or nearby land;
(b) increasing flooding, which adversely affects the safety or
use of any land upstream and downstream; or adversely
affecting the flow of water in any overland flow path.
Environment and heritage Table 6.8.1.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes
Environment, heritage and scenic amenity
**FINAL DRAFT Post Consultation 2019**
Page 11 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.