Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (15.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
Performance outcomes                                                 Acceptable outcomes
PO49                                                                 AO49.1
Development:                                                         Development does not result in sediment or other material
(a)   retains natural vegetation wherever possible;                  including building materials or waste products being deposited or
                                                                     released into the road reserve, stormwater drain or adjacent
(b)   has minimal impact on the natural landform of the site;
                                                                     properties.
(c)   does not lead to erosion or the transport of sediments off
      site;                                                          AO49.2
(d)   does not lead to the disturbance of natural features,          Where there is a nominated building envelope on the lot, clearing
      buildings or structures of cultural heritage significance.     of native vegetation and building works does not extend beyond
                                                                     the building envelope, except for the purposes of a driveway
                                                                     access.

                                                                     AO49.3
                                                                     Development on a site adjoining a heritage site respects the
                                                                     cultural heritage significance of the site by mitigating any adverse
                                                                     impacts on the setting or integrity of the heritage.

                                                                     Editor’s Note— Heritage sites are identified on the Heritage and
                                                                     Character Areas overlay maps in schedule 2.


Infrastructure         Table 6.8.1.3 Criteria for assessment (part)
Performance outcomes                                                 Acceptable outcomes

Infrastructure
PO50
Development is supported by adequate infrastructure and              No acceptable outcome provided
services including reticulated water, sewerage, stormwater
drainage, sealed roads, pathways, electricity and
telecommunication infrastructure.
PO51
Development does not adversely impact on the continued               No acceptable outcome provided
operation, viability and maintenance of existing infrastructure or
compromise the future provision of planned infrastructure.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 12 of 12
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.