Appendix B - Global Stability Assessment Report

Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                  - 14 -
                                                                                       Job No: ME21/032

(b)     have not verified the accuracy or reliability of this information (other than as expressly stated in
        this Report);
(c)     have not made any independent investigations or enquiries in respect of those matters of which
        it has no actual knowledge at the time of giving this Report to the Client; and
(d)     make no warranty or guarantee, expressed or implied, as to the accuracy or reliability of this
        information.

Morrison Geotechnic and the Contributors do not accept responsibility or liability for any incorrect
assumptions related to this Report. For the avoidance of doubt, this Report:

(a)     is based on information contained in the section and corresponding plan provided by the Client;
(b)     cannot predict the ground conditions encountered at any untested location because the ground
        conditions surrounding a test sampling location (or between any two test sampling locations)
        may be different from the test samples we have obtained;
(c)     is not an environmental, contamination or hazardous materials assessment; may be
        invalid, incomplete or inaccurate (including errors in the scope of work, investigation
        methodology, observations, opinions and advice) where the information provided to Morrison
        Geotechnic was invalid, incomplete or inaccurate;
(d)     is limited to observations of those parts of the site that were accessible at the time of the field
        investigation and is not based on observations about areas of the site which were inaccessible
        to the investigation equipment (including slopes, heavily vegetated areas or service corridors);
        and
(e)     is not a comprehensive representation of the actual site conditions and may only show a
        reasonable interpretation of conditions encountered at discrete test locations along with general
        site observations.

No warranty or guarantee, whether express or implied, is made in respect of the geotechnical data,
information, advice, opinions and recommendations present in this Report. In recognition of the limited
use to be made by the Client of this Report, the Client agrees that, to the maximum extent permitted by
law, Morrison Geotechnic and the Contributors shall not be liable for any losses, claims, costs,
expenses, damages (whether in statute, in contract or tort for negligence or otherwise) suffered or
incurred by the Client or any third party as a result of or in connection with the information, findings,
opinions, estimates, recommendations and conclusions provided in the course of this Report.

If further information becomes available, or additional assumptions need to be made, Morrison
Geotechnic reserves its right to amend this Report.

Yours faithfully,                                           Reviewed by




R HOWCHIN                                                   M BALLARD (RPEQ 10223)
For and on behalf of
MORRISON GEOTECHNIC PTY LIMITED

Attached:           Appendix A – Site Plan
                    Appendix B – Borehole Logs
                    Appendix C – Laboratory Test Reports
                    Appendix D – Level 1 Certification Report
                    Appendix E – Provided Section and Plan
                    Appendix F – Global Stability Plots
                    Appendix G – Guidelines for Hillside Construction
                    Important Information about your Geotechnical Engineering Report




Ref: 27222-rev 1                                                              MORRISON GEOTECHNIC
Mr Geoff Hussin
Log in to download the original file

Appendix B - Global Stability Assessment Report.pdf · 10.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.