Appendix B - Global Stability Assessment Report
Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.
The original of this document is very large (10.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
-2-
Job No: ML21/188
1.0 INTRODUCTION
1.1 General
This report summarises the results of Level 1 Inspections, field testing and associated compaction
compliance testing of earthworks filling operations carried out to form the foundation for the Proposed
shed, 36 Tunba court, Mount Cooroy (The Site).
Our involvement with the bulk earthworks filling operations at The Site was between 3rd August 2021
and 19th August 2021
The work was commissioned by Mr Geoff Hussin (The Client).
Earthworks were carried out by falcon earthmoving.
1.2 Previous Earthworks
As far as we have been made aware or what could be determined onsite, no previous earthworks have
been carried out at The Site prior to our involvement.
1.3 The Project
The site is bounded by rural properties to the north east south and west.
2.0 THE BRIEF
Our Brief from the Client was limited to:
• Level 1 Inspection and Testing of the placement and compaction of bulk earthworks fill materials
in accordance with AS3798-2007 – “Guidelines on Earthworks for Commercial and Residential
Developments”.
• Compaction Control Testing in accordance with AS1289 – Testing of Soils for Engineering
Purposes and at frequencies defined in AS3798-2007 Table 8.1.
3.0 METHODOLOGY
Earthworks supervision, assessment and testing was carried out on the stripped and exposed ground
surfaces and during the placement and compaction of fill materials forming residential building
platforms.
Field and laboratory testing included a walk over assessment of the existing ground conditions, proof
roll testing of the stripped surfaces, observations of filling and compaction activities and compaction
testing.
All work was carried out in accordance with AS 3798 (Guidelines on Earthworks for Commercial and
Residential Developments) and AS1289 (Testing of Soils for Engineering Purposes).
3.1 Stripped Surface Assessment
The Site was observed to be cleared of all debris, trees and topsoil. Any visible organic matter, loose
soils, silty soils, and any over wet areas were compacted or removed to depths exposing a suitable
foundation.
Typical materials forming the foundation for new fill are broadly summarised below:
• Silty Sandy Clay (CI), medium plasticity, brown, stiff, moist
3332 – Geoff Hussin MORRISON GEOTECHNIC
Tunba Court - Cooroy Mtn
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.