-3-
Job No: ML21/188
Photo 1 – Stripped Surface
3.2 Filling Operations
Fill materials were sourced onsite and typically comprised:
• Sandy Clay (CI), medium plasticity, orange, moist
• Silty Sandy Clay (CI), medium plasticity, orange - red, moist
Placement, moisture conditioning and compaction of fill materials were carried out using the following
plant:
• Compactor • Posi Track
• Excavator
3332 – Geoff Hussin MORRISON GEOTECHNIC
Tunba Court - Cooroy Mtn
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.