Council archive · source document
Attachment D - Stormwater Report · MCU18/0013
Attached to the e-mail Response to info request part 2 - MCU18/0013.
Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Contents
1. Introduction ..................................................................................................1
2. Site Description ...........................................................................................1
2.1 Location and Land Use .............................................................................1
2.2 Lawful point of discharge ..........................................................................2
2.3 Flooding ....................................................................................................2
3. Stormwater Quantity Management ............................................................2
3.1 Catchment Summary ................................................................................2
3.2 Stormwater Detention & Infiltration ...........................................................2
3.3 Hydrologic and Hydraulic Modelling ..........................................................3
3.4 XP Storm Results ......................................................................................4
4. Water Quality Management ........................................................................7
4.1 Operational Phase ....................................................................................7
4.2 Construction Phase ...................................................................................7
5. Erosion and Sediment Control ...................................................................7
5.1 Maintenance and Monitoring Requirements .............................................8
6. Conclusion ...................................................................................................9
7. Appendices .............................................................................................. A-1
24 Arakoon Street, Sunshine Beach QLD 4567
Job No – S18-003 STORMWATER MANAGEMENT REPORT ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Stormwater Report.PDFRelated documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.