Council archive · source document
Attachment D - Stormwater Report · MCU18/0013
Attached to the e-mail Response to info request part 2 - MCU18/0013.
Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
List of Appendices
Appendix A – Erosion Hazard Assessment (IECA) ........................................................................................ A-1
Appendix B – Engineering Drawing ................................................................................................................ B-1
Appendix C – Site Survey & Architectural Drawings ...................................................................................... C-1
List of Tables
Table 1 - Detention system details......................................................................................................................3
Table 2 - Catchment Summary ...........................................................................................................................4
Table 3 - XP Storm Results ................................................................................................................................5
Table 4 - Pollutants typically generated during the construction phase .............................................................7
Table 5 - ESC maintenance requirements. .........................................................................................................9
List of Figures
Figure 1 – Indicative Site Location (Nearmap, 2017) .........................................................................................1
Figure 2 - Ensemble Statistics Utility Results; 10 year ARI ................................................................................4
Figure 3 - Ensemble Statistics Utility Results; 100 year ARI ..............................................................................5
Figure 4 – XP Storm Results; Pre developed Model (100 year ARI, 5 minute duration) ....................................6
Figure 5 – XP Storm Results; Developed Model (100 year ARI, 5 minute duration) ..........................................6
24 Arakoon Street, Sunshine Beach QLD 4567
Job No – S18-003 STORMWATER MANAGEMENT REPORT iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Stormwater Report.PDFRelated documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.