      Model Setup

      Two models were developed for the site. These are summarised as follows:

      Pre-developed model
                The existing site was modelled as a single catchment (Node A). The hydrograph of the catchment
                 was linked to and evenly distributed across a rainfall/ flow area grid at the rear of the site. The peak
                 flow rate discharging to Sunshine Beach was measured at a flow line at the rear of the site and the
                 total runoff volume discharging to Sunshine Beach was measured as the total runoff inflow at Node
                 A.

      Post-Developed Model
                The developed site was modelled as two catchments. The rear portion of the site consisting of
                 pervious areas (Node A) was modelled as per Node A for the pre developed model. The upper
                 portion of the site consisting of impervious areas was linked to a storage node (Node B) linked to the
                 2D network. This node was used to model the detention/infiltration tank. The peak flow rate
                 discharging to Sunshine Beach was measured at a flow line at the rear of the site and the total runoff
                 volume discharging to Sunshine Beach was measured as the sum of the total runoff inflow at Node A
                 and the total runoff outflow at Node B.

      The catchment data for each model is summarised in Table 2 below:

     Table 2 - Catchment Summary

      Model                    Node        Area (Ha)                   Slope (%)               % Impervious

      Pre Developed            A           0.0635                      25                      0

      Post Developed           A           0.0215                      25                      0

                               B           0.0420                      25                      100


       3.4             XP Storm Results
      The results of the ensemble statistics utility are presented in Figure 2 & Figure 3 below.




                               Figure 2 - Ensemble Statistics Utility Results; 10 year ARI

                                          24 Arakoon Street, Sunshine Beach QLD 4567
Job No – S18-003                             STORMWATER MANAGEMENT REPORT                                             4

Used in these records

About this file

File size
10.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment D - Stormwater Report.PDF · 10.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.