Figure 3 - Ensemble Statistics Utility Results; 100 year ARI
Table 3 below compares the peak flow rates and total runoff volume for the existing and developed model.
Table 3 - XP Storm Results
Median Peak Flow Rate (L/s) Total Volume (m3)
ARI Duration (min) Storm
Pattern Existing Developed Existing Developed
5 N/A 37 18 (-19) 7.15 3.09 (-4.06)
10 5 35 35 13.73 9.95 (-3.79)
10
25 5 29 25 (-4) 24.67 21.94 (-2.73)
60 2 26 27 (+1) 39.06 37.10(-1.96)
5 N/A 60 58 (-2) 14.08 9.23 (-4.85)
10 8 48 49 (+1) 21.05 17.80 (-3.25)
100
25 10 42 42 39.32 35.45 (-3.87)
60 6 35 35 62.53 60.06 (-2.47)
As shown in Table 3, the peak flow rate of stormwater runoff and the total runoff volume off site has not
increased as a result of the development. The 1L/s increase for the 10 year 1 hour design storm and 100
year 10 minute design storm are considered negligible and within the tolerance of the modelling software.
The proposed infiltration/detention tank is therefore considered to be adequate. Results for the 5 minute
duration for the 100 year ARI are outlined in Figure 4 & 5 below.
24 Arakoon Street, Sunshine Beach QLD 4567
Job No – S18-003 STORMWATER MANAGEMENT REPORT 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Stormwater Report.PDFRelated documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.