Skip to the record
Every meeting, every word.

Council archive · source document

Attachment D - Stormwater Report · MCU18/0013

Attached to the e-mail Response to info request part 2 - MCU18/0013.

of 31

Text shows just the words. Original shows the document exactly as it was published.

Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                           Figure 3 - Ensemble Statistics Utility Results; 100 year ARI

      Table 3 below compares the peak flow rates and total runoff volume for the existing and developed model.
     Table 3 - XP Storm Results

                                  Median           Peak Flow Rate (L/s)              Total Volume (m3)
       ARI     Duration (min)     Storm
                                  Pattern        Existing         Developed        Existing     Developed

                      5             N/A              37             18 (-19)         7.15       3.09 (-4.06)

                     10              5               35                35           13.73       9.95 (-3.79)
        10
                     25              5               29              25 (-4)        24.67      21.94 (-2.73)

                     60              2               26              27 (+1)        39.06      37.10(-1.96)

                      5             N/A              60              58 (-2)        14.08       9.23 (-4.85)

                     10              8               48              49 (+1)        21.05      17.80 (-3.25)
       100
                     25             10               42                42           39.32      35.45 (-3.87)

                     60              6               35                35           62.53      60.06 (-2.47)

      As shown in Table 3, the peak flow rate of stormwater runoff and the total runoff volume off site has not
      increased as a result of the development. The 1L/s increase for the 10 year 1 hour design storm and 100
      year 10 minute design storm are considered negligible and within the tolerance of the modelling software.
      The proposed infiltration/detention tank is therefore considered to be adequate. Results for the 5 minute
      duration for the 100 year ARI are outlined in Figure 4 & 5 below.




                                      24 Arakoon Street, Sunshine Beach QLD 4567
Job No – S18-003                         STORMWATER MANAGEMENT REPORT                                            5

Used in these records

About this file

File size
10.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment D - Stormwater Report.PDF · 10.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.