Decision Notice
Integrated Planning Act 1997
Your Department was a referral agency for the above application and provided a response to Council
in a letter dated 28 March 2008. On 25 August 2008, Council decided to approve the application in
full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2008/310
Street address: 1 - 3 Woodland Drive, Peregian Beach
Real property description: Lots 150 & 151 P 93132
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Development Permit for Material Change of Use - Wellbeing Type 2 - Social
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are titled and numbered:
Plan / Rev. Plan / Document Name Date
Document No.
SK.01 A Site Plan/Roof Plan – Thompsett Architecture January 2008
SK.02 A Floor Plan – Thompsett Architecture January 2008
Page 1 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 pages
Page 2
2008/310
SK.03 A Floor Plan Notes & Dimensions – Thompsett January 2008
Architecture
SK.04 A Section AA & Section BB – Thompsett January 2008
Architecture
SK.05 A North Elevation & East Elevation – Thompsett January 2008
Architecture
SK.06 A South Elevation – Thompsett Architecture January 2008
and as may be amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. The open space and setback areas are to be landscaped in accordance with Council’s
Landscaping Code and Planning Scheme Policy PSP3 on Landscaping Plants and Guidelines
and a properly prepared landscape plan prepared by a suitably qualified Landscape Architect
or Horticulturalist. Such landscaping is to be completed prior to the premises being occupied
and maintained at all times thereafter.
4. All fencing shall be setback at least 1 metre from the front property boundary, with at least half
of the fencing setback 2 metres. The area of land between the fence and the front property
boundary shall be densely landscaped to screen any fencing from the street.
5. Any advertising sign or device is to comply with Council's policies on advertising.
6. Secure bicycle racks shall be provided on site to accommodate a minimum of 13 bicycles.
7. The premises are to be identified by the provision of a street number in a prominent location to
ensure it is identifiable to all persons, particularly emergency services personnel.
8. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
9. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
10. The development shall not exceed a maximum building height of 2 storeys and 8 metres
above natural and finished ground level.
11. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the maximum
allowable building height as required by either the conditions of approval or the Planning
Scheme.
12. The Development Permit for a material change of use of premises lapses if the use has not
happened by 25 August 2012, unless an application to extend the currency is approved by
Council.
Page 2 of 13
Page 3
2008/310
Land Development
Lot Amalgamation
13. All separate, adjoining lots that form part of this application shall be amalgamated into one
undivided allotment in accordance with Section 3.7.3 of the Integrated Planning Act 1997 and
the Plan of Survey submitted for registration at the Land Titles Office. Proof of title being
issued for the amalgamated lot shall be submitted to Council prior to the issue of the
Development Permit for Building Works.
Frontage Works
14. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
David Low Way and Woodland Drive frontages of the site in accordance with Planning
Scheme Policy PSP03 Landscaping Plants & Guidelines. Grass shall be couch and free of
weeds.
15. All paths, pram ramps, driveways and parking areas shall be designed and constructed to
ensure pedestrian safety using non-slip materials, to produce an evenly graded surface finish,
and to be in accordance with the Disability Discrimination Act 1992 and Australian Standard
1428.1 Design for Access & Mobility.
Roof Water & Stormwater Drainage
16. Roof runoff from any new building shall be directed to a rainwater storage system or tank that
is installed to ensure water from the rainwater storage system or tank is used for external uses
(such as watering gardens, irrigation, ornamental ponds, water features, outdoor cleaning, etc)
and for internal (ground floor) use in washing machine cold taps and toilet cisterns. All
rainwater tanks are to be designed and installed in accordance with the Queensland
Development Code (QDC) current at the time of building approval, and shall be part of the
plumbing application for approval. The location and capacity of the tanks shall be clearly
shown on the plans submitted for Building Works approval and any overflow shall be directed
to the kerb and channel located in Woodland Drive.
17. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s
kerb & channel street drainage system in Woodland Drive. Plans of the drainage design shall
be prepared by a Registered Professional Civil Engineer and submitted as part of any
application for a Development Permit for Building Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
drainage system at any one location is 25 litres/second.
18. All site stormwater drainage shall be by means of a gravity system.
19. The site shall be sufficiently stabilised at all times to ensure no scour or sediment laden runoff
to the Council’s kerb & channel street drainage system
Sewer Mains
20. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
21. The existing sewer main that traverses the site and the ‘zone of influence’ (taken as the area
within a 45-degree angle measured from the invert of the sewer main to the finished surface
level) shall be accurately located and determined by a licensed Surveyor and shown on all
plans submitted for Building Works approval.
In respect of the ‘zone of influence’ the proposed building shall be relocated so that it is not
located within the ‘zone of influence’.
Page 3 of 13
Page 4
2008/310
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
As such the applicant shall amend Building plans to ensure compliance.
Town Water Supply
22. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
23. Each individual water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
24. All water meters must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s Water & Sewerage Capital Works
Manager prior to lodgement and approval of hydraulic drawings.
Service Easements (Sewer)
25. A registered easement shall be created over the zone of influence of all sewers within the
subject site and over those parts of the subject site that are impacted upon by sewers on any
adjoining sites. The easements shall generally be parallel to and centred over the sewer main
and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
within the allotment (measured from the finished surface) and be no less than 3.0m wide
overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
determine the necessary width of the easement, which shall be shown on any plans submitted
for Building Works approval. To this extent the surveyor shall certify that the sewer and the
zone of influence is wholly contained within the easement to be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
26. No building or other structure shall be constructed or encroach over an easement.
Erosion and Sediment Control
27. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures that are necessary during construction include, but are not limited
to silt fencing, controlled gravel access to the site and controlled disposal of waste.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted as part of any application for a Development Permit for Building Works.
General
28. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
29. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
30. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Page 4 of 13
Page 5
2008/310
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Area management Concurrence Environmental Contaminated Land Unit
advice given for Protection Agency GPO Box 2771
unexploded ordnance BRISBANE QLD 4001
A copy of any referral agency conditions is attached.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
SK.01 A Site Plan/Roof Plan – Thompsett January 2008
Architecture
SK.02 A Floor Plan – Thompsett Architecture January 2008
SK.03 A Floor Plan Notes & Dimensions – January 2008
Thompsett Architecture
SK.04 A Section AA & Section BB – Thompsett January 2008
Architecture
SK.05 A North Elevation & East Elevation – January 2008
Thompsett Architecture
SK.06 A South Elevation – Thompsett January 2008
Architecture
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is advised that development contributions and infrastructure charges applicable
to this development approval have been based on the following Uses Class/ Uses and
applicable quantities: -
Existing Development Approved Development
Existing Use Class Approved Use Class
Existing Quantity Approved Quantity
/ Use / Use
Community Uses –
2
Detached Housing 2 Lots Wellbeing Type 2 385m use area
Social
2. The applicant is informed that payment of the following Infrastructure Charge and contribution
amounts as at June 2008 have been waived in accordance with Council’s Policy for Rate
Rebates and Waiver of Fees for Community Organisations:
Infrastructure Charge or Planning Scheme Policy: Amount:
Council’s Coastal Major Road Network Infrastructure Charges Plan $ 54,913
Page 5 of 13
Page 6
2008/310
Council’s Planning Scheme Policy PSP13 Contributions in Lieu of the $ 224,200
Provision of Off-Street Parking (19 spaces)
Council’s Planning Scheme Policy PSP20 Pathway Trunk Network
$ 1,140
Contributions
3. The applicant is advised that a Compliance Permit for all plumbing and drainage works within
the boundaries of the development site shall be obtained from Council’s Plumbing Services
Section prior to obtaining a Development Permit for Building Works.
4. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.
5. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities
under the Disability Discrimination Act (DDA) in regard to the installation of disabled access
and the provision of disabled facilities, and that access to this building and the provision of
sanitary facilities may need to comply with the requirements of Section D Part D3 and Section
F Clause F2.4 of the Building Code of Australia.
6. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
6.1. On a Sunday or public holiday, at any time; or
6.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
Page 6 of 13
Page 7
2008/310
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Advertising Devices Code
12 SUBMISSIONS
Not applicable
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Tracy Jones
SENIOR PLANNING OFFICER
Page 7 of 13
Page 8
2008/310
Referral Agency Conditions –
Environmental Protection Agency
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
Page 8 of 13
Page 9
2008/310 Page 9 of 13 [OCR of page images] 2008/310 IDAS C-6 maintains a list of commercial UXO investigation and remedial search contractors that it accredits to carry out this work. Defence also recommends that owners or occupiers of potentially affected land and workers and contractors employed on the land need to be aware of the procedure if a suspect object is found. As the EPA has no record of the site being further investigated or remediated, it is considered that there remains a possibility of UXO being found on it. 4 Conditions The following concurrence agency conditions are to be attached to any approval: 4.1 Prior to the commencement of any development-related excavation, earthworks or soil disturbance, that part of the site to be so worked is to be subjected to investigation and, where necessary, appropriate remedial action. 4.2. Any person employed to work on any part of the site where Condition 4.1 has not been satisfied is to be forewarned in writing by the applicant. This warning is to explain that information available to the EPA indicates a potential for residual UXO exists on the site and work should proceed with due caution. It is to state the procedure to be followed by any person finding an object suspected of being explosive ordnance or component thereof: Do not disturb the object. Take action, where appropriate, to prevent it being disturbed by another person. Note its approximate dimensions and general appearance. Note the route to its location. Advise the Police as soon as possible. 4.3 Following investigation and any remedial action taken to satisfy Condition 4.1 above, the applicant is to submit a report, prepared in accordance with current guidelines, to the EPA for assessment. The EPA is to subsequently advise the Noosa Council and the applicant of its assessment in regard to Condition 4.1 being satisfied. 4.4 No gravel, rock, sand or soil is to be removed from the balance part of site without written EPA approval. 4.5 The applicant is to advise the owner and any occupier of the site of the above responsibilities. 5 Additional comments or advice . Applicants may contact the EPA’s Contaminated Land Unit on (07) 3224 5644 or visit the Defence website http://www.defence,vov.au/uxo/ for the details of current UXO investigation and remedial search contractors. The EPA accepts reports based on investigative and remedial work carried out by these contractors. Investigation and remedial action to satisfy Condition 4.1 typically involves sampling/search programs with detection equipment unless the use of such equipment is: * considered unwarranted by a UXO contractor due to the extent of any prior excavation or earthworks or, conversely, of any filling proposed as part of the development program; or VER2 Page 9 of 13
Page 10
2008/310 Page 10 of 13 [OCR of page images] 2008/310 IDAS C-6 © prevented or made impracticable by the presence of a structure, stockpile, natural barrier or metal waste. In the latter case, alternative action may be appropriate to minimise the risk in the first instance. For example, where the risk of exposure to any UXO that may exist is reduced by the presence of a structure or natural barrier, issuance of the standard UXO warning (see Condition 4.2) may suffice while the structure, stockpile or barrier remains in place. Where a structure is to be removed or reduced as part of the development program, protective precautions, commensurate with any greater tisk to which workers might then be exposed, may need to be considered. Progressive assessment will be necessary where such circumstances exist. Unless, at the completion of preliminary works, there is evidence then available to the UXO contractor that any residual risk is negligible, t the use of detection equipment will typically be required to confirm the site’s status. Where investigation, along with any subsequent remedial action and assessment, is to be implemented by stages to satisfy Condition 4.1 and 4.3, a preliminary investigation report should be submitted by the applicant to the EPA along with a management plan for the proposed work. Staged investigation/remediation is most likely to be applicable where development of smaller, built-on lots (which can present circumstances such as those discussed above) or broadhectare sites is proposed. In such cases, the EPA’s assessment of the report and advice to Council in regard to approval of the development will be dependent on agreement with the management plan. Where Condition 4.1 is to be satisfied by a whole lot or broadhectare development stage being subjected to investigation and any necessary remedial action, the EPA, based on the subsequent investigation/remediation report’s findings and recommendation/s, may reassess the lot, or that portion comprising the development stage, as being remediated or not needing remediation, and advise the applicant and Council accordingly. Otherwise, any balance of land that has not been further investigated will retain the risk assessment made by Defence. This is unless evidence obtained from the investigated part/s can be used to refute Defence’s assessment in regard to all or part of the balance. In the latter case, the EPA may reassess all of the balance or the applicable part/s as being unaffected by UXO. 6 Additional information This concurrence response applies only to contaminated land issues and does not remove the need to obtain any further approval for this development which may be required by this or other legislation, State and/or Commonwealth. Applicants are advised to check with ali relevant statutory authorities. Applicants should also comply with all relevant legislation. The EPA has not provided a notification to native title parties for this application. The State’s Native Title Work Procedures indicate that the responsibility for assessment of native title issues for an IDAS application rests with the Assessment Manager. It is recommended that the Assessment Manager determines whether native title notification is required for this application. *End of response* IDAS C-6 CLM VER 2 Page 10 of 13
Page 11
2008/310 Page 11 of 13 [OCR of page images] 2008/310 UNEXPLODED ORDNANCE (UXO) CONTRACTORS Department of Defence accredited UXO investigation and remedial search contractors are listed below. The Environmental Protection Agency (QLD) accepts reports based on investigative and remedial work carried out by these contractors. BACTEC South East Asia Pty Ltd Managing Director: Timothy Pippett Unit 1, 43 Stanley Street PEAKHURST NSW 2210 Tel: (02) 9584 7500 Mobile: 0412 663 541 Fax: (02) 9584 7599 Website: http://www.bactec.com.au/ Manager, Expiosive Ordnance Services: Mark Latimer Tel/Fax: (07) 5526 0881 0438 443 283 [email protected] G-tek Australia Pty Ltd Chief Operating Officer: Greg Guthrie 25 Applecross Avenue CASTLE HILL NSW 2154 Tel: (02) 9680 7268 Mobile: 0418 977 424 Fax: (02) 9680 7403 Email: Website: :/www.g-tek.biz/ UXO Projects Manager: Max Verrier Tel: (07) 5493 8577 Mobile: 0418 776 203 Fax: (07) 5493 7405 Milsearch Pty Ltd Managing Director: David Halmarick Unit 5, Level | 30 Mawson Place MAWSON ACT 2607 Mailing Address: PO Box 687 MAWSON ACT 2607 (02) 6286 8299 Mobile: 0419 944 397 Fax: (02) 6286 8266 i]: [email protected] Website: http:/Avww.milsearch.com.au/ Queensland Operations Manager: Paul Ingerton Tel: (07) 3824 1669 Mobile: 0413 452698 Email: [email protected] CSG Demining Consultants (Offers all Consultancy & Investigation services but does not undertake Remediation) Managing Director: Carl Chirgwin 151 Golf Links Road MAIDEN GULLY Vic 3551 Tel: (03) 54462408 Mobile: 0417-527264 Website: http://www.csgdemining.com.au /iwww.defence.gov.au/uxol Version — 21/08/2007 ist is drawn from the Department of Defence National UXO Office’s panel of UXO investigation and remedial search companies that can be found on he Page 11 of 13
Page 12
2008/310
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
(5) If an application is processed under section
The following is an extract from the Integrated 6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4). application are available only for the aspects of the
development that would have required public
Division 8 - Appeals to court relating to
notification under the repealed Act.
development applications
Appeals by applicants (6) If an application involves assessment
4.1.27.(1) An applicant for a development against a concurrence agency code, appeal rights
application may appeal to the court against any of for submitters for the application are not available
the following- against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a concurrence agency’s response for the code.
development application; Appeals by advice agency submitters
(b) a matter stated in a development approval, 4.1.29.(1) An advice agency may, within the limits
including any condition applying to the of its jurisdiction, appeal to the court about the
development, and the identification of a code giving of a development approval for a
1
under section 3.1.6; development application if-
(c) the decision to give a preliminary approval (a) the development application involves impact
when a development permit was applied for; assessment; and
(d) the length of a currency period; (b) the advice agency told the applicant and the
(e) a deemed refusal. assessment manager to treat its response to
the application as a submission for an appeal.
(2) An appeal under subsection (1)(a) to (d)
must be started within 20 business days (the (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the business days after the day the decision notice or
decision notice or negotiated decision notice is negotiated decision notice is given to the advice
given to the applicant. agency as a submitter.
(3) An appeal under subsection (1)(e) may be Appeals for matters arising after approval given
started at any time after the last day a decision on (co-respondents)
the matter should have been made. 4.1.30.(1) For a development approval given for a
Appeals by submitters development application, a person to whom any of
the following notices have been given may appeal
4.1.28.(1) A submitter for a development
to the court against the decision in the notice-
application may appeal to the court about-
(a) a notice giving a decision on a request for
(a) the giving of a development approval, including
extension of the currency period for an
any conditions (or lack of conditions) or other
approval;
provisions of the approval; or
(b) a notice giving a decision on a request to make
(b) the length of a currency period for the approval.
a minor change to an approval.
(2) The appeal must be started within 20
(2) The appeal must be started within 20
business days (the “submitters appeal period”)
business days after the day the notice of the
after the day the decision notice or negotiated
decision is given to the person.
decision notice is given to the submitter.
(3) Subsection (1)(a) does not apply if the
(3) If a person withdraws a submission before
approval resulted from a development
the application is decided, the person may not
application (superseded planning scheme)
appeal the decision.
that was assessed as if it were an
(4) If an application involves both impact application under a superseded planning
assessment and code assessment, appeal rights scheme.
for submitters are available only for the part of the
(4) Also, a person who has made a request
application involving impact assessment.
mentioned in subsection (1) may appeal to
the court against a deemed refusal of the
request.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 12 of 13
Page 13
2008/310
(5) An appeal under subsection (4) may be For Building Works Only
started at any time after the last day the Rights of appeal conferred by Section 4.2.9 of the
decision on the matter should have been Integrated Planning Act 1997 as follows:
made.
Division 3 – Appeals to tribunals relating to
development applications
Division 9 - Appeals to court about other
matters Appeals by applicants
Appeals for matters arising after approval given
(no co-respondents)
4.2.9(1) An applicant for a development application
4.1.31.(1) A person to whom any of the following may appeal to the Building and Development
notices have been given may appeal to the court Tribunal against any of the following-
against the decision in the notice-
(a) the refusal, or the refusal in part, of a
(a) a notice giving a decision on a request to development application;
change or cancel a condition of a development
approval. (b) a matter stated in a development approval,
2 including any condition applying to the
(b) a notice under section 6.1.44 giving a decision development, and the identification of a code
to change or cancel a condition of a under section 3.1.6;
3
development approval.
(c) the decision to give a preliminary approval when a
(2) The appeal must be started within 20 development permit was applied for;
business days after the day the notice of the
(d) the length of a period mentioned in section 3.5.21
decision is given to the person.
currency period;
(3) Also, a person who has made a request
(e) a deemed refusal.
mentioned in subsection (1)(a) may appeal
to the court against a deemed refusal of the (2) An appeal under subsection (1)(a) to (d) must
request. be started within 20 business days (the “applicant’s
appeal period”) after the day the decision notice or
(4) An appeal under subsection (3) may be negotiated decision notice is given to the applicant.
started at any time after the last day the
(3) An appeal under subsection (1)(e) may be
decision on the matter should have been started at any time after the last day a decision on the
made. matter should have been made.
Appeals against decisions to change approval The Registrar for the Building and Development
conditions under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a http://www.localgovernment.qld.gov.au/
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.
(2) The appeal must be started within 20
business days after the day notice of the decision
is given to the applicant.
2
Section 6.1.44 (Conditions may be changed or
3
cancelled by assessment manager or concurrence Section 3.1.6 (Preliminary approval may override
agency in certain circumstances) local planning instrument)
Page 13 of 13
Used in these records
Decision Notice - Concurrence Agency - EPA [As Published]Related documentApplication case desk ↗
About this file
- File size
- 305 KB (small file)
- File type
No other editions are linked here.