Traffic Impact Assessment
Original PDF page 22, section 1. The text section number identifies this passage in the reader.
Table 4.3: COOROY BELLI CREKE ROAD / SCHOOL ACCESS OPERATIONS
PEAK HOUR & AVG 95%
DOS CRITICAL MOVEMENT
SCENARIO DELAY QUEUE
Weekday Morning
2023 Pre-Development 9% 2.6s 0.4 vehicles Northern Approach Right Turn
2023 Post-Development 10% 2.9s 0.5 vehicles Northern Approach Right Turn
2033 Pre-Development 10% 2.4s 0.4 vehicles Northern Approach Right Turn
2033 Post-Development 11% 2.7s 0.5 vehicles Northern Approach Right Turn
Weekday Afternoon
2023 Pre-Development 11% 2.9s 0.4 vehicles Western Approach Left Turn
2023 Post-Development 13% 3.3s 0.6 vehicles Western Approach Left Turn
2033 Pre-Development 11% 2.7s 0.4 vehicles Western Approach Left Turn
2033 Post-Development 13% 3.1s 0.6 vehicles Western Approach Left Turn
4.4.2 Maple Street / Overlander Avenue
The analysis of the Maple Street / Overlander Avenue priority-controlled intersection was
undertaken using the SIDRA intersection representation shown in Figure 2.6. The results of the
analyses are attached in Appendix C and summarised in Table 4.4. As demonstrated, the
intersection is expected to experience LOS A operations during the weekday morning and afternoon
peak hours, under 2023 and 2033 pre and post development scenarios. The addition of
development generated traffic is not expected to have a significant adverse impact on the
intersection operations.
The reduced average delay under 2023 post-development conditions in the afternoon peak hour
is due to the increased volume of through vehicles (which experience no delay) at the intersection.
Table 4.4: MAPLE STREET / OVERLANDER AVENUE OPERATIONS
PEAK HOUR & AVG 95%
DOS CRITICAL MOVEMENT
SCENARIO DELAY QUEUE
Weekday Morning
2023 Pre-Development 11% 1.6s 0.2 vehicles Northern Approach Through
2023 Post-Development 12% 1.6s 0.3 vehicles Northern Approach Through
2033 Pre-Development 13% 1.6s 0.3 vehicles Northern Approach Through
2033 Post-Development 14% 1.6s 0.4 vehicles Northern Approach Through
Weekday Afternoon
2023 Pre-Development 13% 1.5s 0.2 vehicles Southern Approach Right Turn
2023 Post-Development 15% 1.4s 0.2 vehicles Southern Approach Right Turn
2033 Pre-Development 16% 1.5s 0.3 vehicles Southern Approach Right Turn
2033 Post-Development 18% 1.5s 0.3 vehicles Southern Approach Right Turn
P:\2020-21\21-313 NOOSA CHRISTIAN COLLEGE\OUTPUTS\21-313 TRAFFIC IMPACT ASSESSMENT.DOCX 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.