Traffic Impact Assessment
Original PDF page 21, section 1. The text section number identifies this passage in the reader.
Figure 4.1: DISTRIBUTION OF DEVELOPMENT GENERATED TRAFFIC
XX% Both Peak Hours
MAPLE STREET
XX% Weekday AM Peak Hour
XX% Weekday PM Peak Hour
80%
85%
OVERLANDER AVENUE
10%
75% 20%
85% 10%
SITE 95%
90%
95%
5%
10%
5%
COOROY BELLI
CREEK ROAD
4.4 Intersection Performance
The likely impact of the proposed expansion on the peak hour operations on the surrounding road
network has been assessed using SIDRA. These analyses are based on the peak hour turning
movement forecasts presented in Appendix D.
4.4.1 Cooroy Belli Creek Road / School Access
The analysis of the Cooroy Belli Creek Road / School Access priority-controlled intersection was
undertaken using the SIDRA intersection representation shown in Figure 2.5. The results of the
analyses are attached in Appendix C and summarised in Table 4.3. As demonstrated, the access
is expected to experience LOS A operations during the weekday morning and afternoon peak
hours, under 2023 and 2033 pre and post development scenarios. The addition of development
generated traffic is not expected to have a significant adverse impact on the access operations.
P:\2020-21\21-313 NOOSA CHRISTIAN COLLEGE\OUTPUTS\21-313 TRAFFIC IMPACT ASSESSMENT.DOCX 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.