Response to Stormwater Management Approval Conditions Letter
Attached to the e-mail Operational Works Application OPW16 /0203 - 1 of 4.
3 of 6
Response
As indicated in Section 4.5 in SWMP Report No. 16-001014-01A, proposed stormwater management devices are
adequate to treat stormwater runoff to meet Water Quality Objectives (WQOs) specified under the Healthy
Waterways WSUD Technical Guidelines for SEQ (2006) and the SPP (2014) prior to release off site.
Table 4-7 from SWMP Report No. 16-001014-01A has been provided below demonstrating that WQOs will be
achieved.
Table 4-7: MUSIC Modelling Results (Extract from SWMP Report No. 16-001014-01A)
TSS TP TN Gross Pollutants
Description
(kg/yr) (kg/yr) (kg/yr) (kg/yr)
Developed Site Only (Without
29,700 65 425 4,270
Mitigation)
WQOs (Percentage Reduction) 80% 60% 45% 90%
Load Retention Target 23,760 39 191 3,843
Developed Site plus External
36,500 77 480 4,630
Catchment (Without Mitigation)
Developed Site plus External
12,700 33 289 488
Catchment (With Mitigation)
Load Retention Achieved 23,800 44 191 4,142
Load Retention Achieved as % of
80% 68% 45% 97%
Developed Site Load
Objective Achieved? YES YES YES YES
Two models have been provided to Council, the “Developed Site Only” model and the “Developed Site with External
- Mitigated” model. The methodology for demonstrating that WQOs for the site have been met is summarised below.
The Load Retention Target (in kg/yr) for the site was determined using the “Developed Site Only” model,
estimating the pollutants generated from the developed site only.
The Load Retention Achieved (in kg/yr) was determined using the “Developed Site with External - Mitigated”
model, estimating the amount of pollutants removed from site and External Catchment B1 and C1 as a result of
the stormwater quality improvement devices.
A comparison between the targets and pollutant retention achieved demonstrate that WQO’s for the site have been
met. This approach is consistent with past DA approvals (for the interim layout) and earlier discussions with
Council.
Catchment B1 and C1 as shown on Drawing No. B14158.W-SK102 are external and are not part of the site area.
While External Catchment B1 and C1 have been included in the stormwater quality analysis (as runoff from these
areas enter the site and into proposed stormwater quality treatment devices), these areas are not considered a “part
of the development” or identified as ‘site area’. As such, determining the amount pollutant reduction required to meet
objectives for the site (i.e. Load Retention Target) does include the pollutants generated from the external
catchment areas. The Load Retention Achieved has been determined by the total pollutants removed by the
proposed SQID’s prior to discharge from the site.
The approach and methodology outlined above is in line with past approved documentation and is therefore
considered to be appropriate as it demonstrates that WQO’s for the site will be achieved through the proposed
stormwater quality improvement devices.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.