Council archive · source document
Forms 47 Wyuna Dve Noosaville · OPW17/0015
Attached to the e-mail Operational Works Application OPW17/0015.
Department of Infrastructure, Local Government and Planning IDAS form 23-1 lal. (Sustainable Planning Act 2009 version 3.1 effective 3 August 2015) This form must be used for development applications for: e operational work that is tidal works (including prescribed tidal works) or operational work within the coastal management district (mentioned in the Sustainable Planning Regulation 2009, schedule 7, table 2, item 13) e material change of use that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 3, item 5 because it involves: - operational work carried out completely or partly in the coastal management district; or - building work carried out completely or partly in the coastal management district that is the construction of a new premises with a gross floor area (GFA) of at least 1000m? or the enlargement of the GFA of an existing premises by more than 1000m? e reconfiguring a lot that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 2, item 14 because the land is situated completely or partly in the coastal management district or the reconfiguration is in connection with the construction of a canal e building work that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 1, item 11 because it is on land completely or partly seaward of a coastal building line. You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this form. Notes for completing this form For all development applications you must: e complete DAS form 1—Application details e complete any other forms relevant to your application e provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Coastal Management and Protection Act 1995, the Coastal Protection and Management Regulation 2003, the Sustainable Planning Act 2009 (SPA) or the Sustainable Planning Regulation 2009. | Mandatory requirements | 1. Confirm the following mandatory requirements accompany Confirmation of Method of this application lodgement lodgement Written description of the proposal, including a report that addresses any [IY Confirmed relevant policies. [2. What is the nature of the work or development proposed by the application? (Tick all applicable boxes.) “1 Operational work—complete table A LC Material Change of Use—complete table B | Reconfiguring a Lot—complete table Cc LC] Building Work—complete table D Queensland Government
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Forms 47 Wyuna Dve Noosaville.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.