Skip to the record
Every meeting, every word.

Council archive · source document

Forms 47 Wyuna Dve Noosaville · OPW17/0015

Attached to the e-mail Operational Works Application OPW17/0015.

of 13

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Department of Infrastructure, Local Government and Planning

 

 

 

Table A—Operational Work

 

Does the operational work involve the following? (Tick all applicable boxes.)

a) Tidal works as defined under the Coastal Protection and Management Act 1995 (e.g. basins, breakwater, bridges,
boat ramps, decks and boardwalks, docks, dockyards, groynes, jetties, marinas, pipelines, pontoons, powerlines,
seawalls, slips, training walls, wharves and the reclamation of land under tidal water)?

C No [Yes

If yes, what is the purpose?
[ CONSTRUCT A NEW PONTOON STRUCTURE TO REPLACE OLD PONTOON. |

 

 

wy Private purpose (e.g. private pontoon)
[_] Another purpose (e.g. commercial marina)

Does the tidal works also require resource allocation under the Coastal Protection and Management Act 1995?

[J No C] Yes

If applicable what is the estimated value of the proposed works?

 

 

 

 

b) Interfering with quarry material as defined under the Coastal Protection and Management Act 1995 (e.g.
excavating or moving sand, gravel or any other earth material on state coastal land such as roads, esplanades,
parks or unallocated state land) on state coastal land above high-water mark.

ra) No LE] Yes
If yes, which of the following?

CJ Works for coastal management purpose involving beach nourishment, dune fencing, revegetation of dunal areas
with endemic native plants, or stinger net enclosures.

CL For purposes directly related to the provision of lifesaving or rescue services by a volunteer community
organisation.

[] For other purposes (please state below).

L i

If applicable what is the estimated value of the proposed works?

L |

c) Disposing of dredge spoil or other solid waste material in tidal water?
No L] Yes
If applicable what is the estimated value of the proposed works?

 

 

 

d) Constructing an artificial waterway?

I No LI Yes

If applicable what is the length of the waterway?

e) Removing or interfering with coastal dunes on land, other than state coastal land, that is in an erosion prone area
as defined in the Coastal Protection and Management Act 1995 and above high water mark (e.g. lowering dune
vegetation on freehold and leasehold land)?

No O Yes

If applicable what is the estimated value of the proposed works?

 

 

 

IDAS form 23

 

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Forms 47 Wyuna Dve Noosaville.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.