    2.0    CONSTRUCTION PHASE

    The construction     phase of the development would be expected      to progress
    through the following stages:

           Initial clearing and preparation for earthworks using heavy machinery such
           as bulldozer, tractor, excavator etc.


           Bulk earthworks to prepare pads for poultry sheds and form internal
           roadways and stormwater management system using heavy machinery
           such as bulldozer, excavator, grader etc.

           Construction of sheds including steel framing, insulated wall panels and
           insulated roofing.

           Fit-out of mechanical ventilation and computer control system, heaters,
           feed silos, feed system and drinker system.

           Commissioning testing.



    The construction phase of the poultry farm involves significant earthworks and
    structures   and   will
                         be managed by the contractor in accordance with a
    construction management plan.     It is not feasible to provide such detail at
    development application stage.

    Environmental impacts during the construction phase of the project will be the
    responsibility of the contractor and managed under a construction Environmental
    Management Plan which addresses issues including:

           Stormwater Management (sediment control)

           Dust Management

           Noise Management

           Waste Management



    Typically a construction    Environmental   Management Plan is prepared by the
    contractor prior to commencement of works.




    Ridgewood 12-002                         5                    11 September 2013
Log in to download the original file

Response to oustanding issues Animal Husbandry MCU12_0184.pdf · 126 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.