Original source · versioned page text
Response to oustanding issues Animal Husbandry MCU12/0184
Very large file: it may take a few minutes
The original of this document is very large (126 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
-
~
Callaghan & Toth
on Map SBC, on-site detention measures are
contained within the developed areas of the site, clear
of drainaae lines and aoen Soace Precincts.
Run-off treatment S6.1 Runoff will continue to exit the site as sheet flow. The
06 Run-off that leaves the site is treated so as not to proposed stormwater treatment train for the Poultry farm
adversely impact on the ecology and hydrology of 56.1 & 57.1 Development complies with the water component will treat pollutants from increased hard-stand
areas. The avocado farm will not be fertilised with
downstream environmental flows; quality standards in Table 2 of the SEQ Regional Plan
com posted Poultry litter rather than commercial fertilisers -
AND Implementation Guideline NO.7 for Water Sensitive this will be managed to ensure nutrient levels are not
Urban Design.
increased on the site.
07Within the Shire Business Centre site, as shown
on Map SBC- S7.1 N/A
a) run-off treatment occurs within the site; and
b) drainage lines are only used for final polishing of
run-off.
Town water supply connections 58.1 A suitable backflow prevention device is S8.1 N/A
08 Backflow devices or similar systems ensure water installed to protect the potable water within the
reuse facilities have no impact on the quality of the reticulated water supply in accordance with AS/NZS
town mains water. 3500:2003 Plumbina and Drainaae.
Use of natural treatments and systems
09 Natural treatment strategies, including grass S9.1 Proposed stormwater treatment for the works include
bioretention basins, bioretenlion swales, grassed swales,
swales and bio-retention systems, vegetated filtration 59.1 & 510.1 Development complies with the water
grassed buffers and rainwater tanks.
strips and gross pollutant traps, are used wherever quality standards in Table 2 of the SEQ Regional Plan
practicable; Implementation Guideline NO.7 for Water Sensitive
AND Urban Design.
S10.1 N/A
010 Within the Shire Business Centre, as shown on
Map SBC- where necessary, drainage lines are
ecologically enhanced to ensure that the water quality
oolishina functions are of hiah standard.
B
1209 Animal Husbandry Top Forestry Rd, Ridgewood SWQMP_REV_3
SEPTEMBER 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.