2017-12-18 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 18 DECEMBER 2017
3 FURTHER REPORT MCU16 0098 01 & OPW16 0183 PERMISSABLE CHANGE TO AN
EXISTING APPROVAL FOR INDUSTRIAL BUSINESS TYPE 2 NOOSA CHOCOLATE
FACTORY, ANCILLARY CAFE & DWELLING UNIT AND ASSOCIATED OPERATIONAL
WORKS AT 21 VENTURE DRIVE, NOOSAVILLE
Committee Recommendation
Moved: Cr Wellington
Seconded: Cr Jackson
That Council note the Report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 12 December 2017 and the Further Report to the
General Committee Meeting dated 18 December 2017 regarding Application No.
MCU16/0098.01 and OPW16/0183 for a Permissible Change to the Existing Approval for a
Material Change of Use for Industrial Business Type 2 – Noosa Chocolate Factory,
Entertainment and Dining Business Type 1 – Food & Beverage, Ancillary Dwelling Unit and
associated Operational Works, situated at 21 Venture Drive, Noosaville and:
A. Amend condition 2 and 5 of approval MCU16/0098.01 to read as follows:
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
DA200-01 D Ground Floor, drawn by Tim Stewart Architects 26.10.17
DA200-02 B Mezzanine Floor, drawn by Tim Stewart Architects 24.10.17
DA300-01 B Building Elevations (Eastern & Northern), drawn by 24.10.17
Tim Stewart Architects
DA300-02 B Building Elevations (Western & Southern), drawn 24.10.17
by Tim Stewart Architects
5. The outdoor dining area must not exceed 40m2.
B. Amend condition 28 of approval OPW16/0183 to read as follows:
Approved Plans
28. Development undertaken in accordance with this operational works approval
must generally comply with the approved plans of development. The approved
plans are listed in the following table unless otherwise amended by these
conditions.
Plan No. Rev. Plan/Document Name Date
C001 A Drawing Index and Standard Notes, 18/08/2016
Job No: SC-5734 prepared by Empire Engineering
C020 A Siteworks and Drainage Plan, prepared by 18/08/2016
Job No: SC-5734 Empire Engineering
C025 A Siteworks and Drainage Sections and 18/08/2016
Job No: SC-5734 Details, prepared by Empire Engineering
C030 A Pavement Plan, prepared by Empire 18/08/2016
Job No: SC-5734 Engineering
Page 3 of 5