Original source · versioned page text
Appendix 4 - Flora Survey & Permit
Attached to the e-mail MCU15/0061 Development Application - Appendix 4, 5, 6 & 7 Email 2 of 2.
Ws / 4 Potential impacts and mitigation measures 4.1 Potential impacts As the proposed clearing footprint for the NBN Co facility is located within a highly disturbed area of the subject site, it is not expected that the clearing of the footprint will have a significant impact on the adjacent environment. The following section outlines general mitigation measures which will be implemented to minimise impacts of the proposed development. 4.2 Mitigation measures The following mitigation measures will be implemented: Notify DEHP of clearing via exempt clearing notification (protected plants) form All machinery, equipment and materials will be cleaned and certified weed and pest free (ie by completing a Weed Hygiene Declaration Certificate) prior to coming on to site and records kept Clearing will be limited to be that which is necessary for the proposed development A Construction Environmental Management Plan (CEMP) for the proposed works will: — Minimise the risk of the release of pollutants and/or nutrients into the surrounding environment — Manage the potential introduction and/or spread of weed species within the proposed development area and surrounding environment. — Implement appropriate erosion and sediment control measures during construction to ensure sediment is not released « aurecon Leading. Vibrant. Global. Project 226420 File Davis Road Protected Plant Survey Report_CK 29 April 2015 Revision 0 Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.