Original source · versioned page text
Appendix 4 - Flora Survey & Permit
Attached to the e-mail MCU15/0061 Development Application - Appendix 4, 5, 6 & 7 Email 2 of 2.
Wb / «Cassandra Arkinstall» «Environmental Scientist» Woolgoolga to Ballina Pacific Highway Upgrade - Koala Management Plan - NSW roads and Maritime Service = Development of a Koala Management Plan for the Woolgoolga to Ballina section of the Pacific Highway between Hexham and the Queensland border (part of the Pacific Highway Upgrade Program) = Koala Management Plan addressed the potential and residual impacts of the upgrade on Koala (Phascolarctos cinereus) populations and potential habitat. The Plan was developed in consultation with the NSW Office of Environment and Heritage (OEH) and the Commonwealth Department of Sustainability, Environment, Water, People and Communities (DSEWPaC) Ecological assessment and surveys of the Stage 2 Richlands to Springfield Transport Corridor — TrackStar Alliance = Ecological assessment of facility sites associated with the Transport Corridor (eg Springfield Station car park) = Targeted EVNT flora surveys for 4 species known to occur within region, including Marsdenia coronata, Maundia triglochinoides, Eucalyptus curtisii and Phaius australis = Verification of Regional Ecosystem and High Value Regrowth mapping = Weed surveys to record the location of species declared under the provisions of the Land Protection (Pest and Stock Route Management) Act 2002 = Koala habitat tree survey in accordance with the requirements of the Nature Conservation (Koala) Conservation Plan 2006 and the South East Queensland Koala Conservation State Planning Regulatory Provisions = Identification of suitable design and locations for the placement of gates/structures to allow safe fauna passage Review and update of GLNG Upstream EPC Environmental Management Plan and Regulatory and Compliance Plan — Santos Ltd = Initial gap analysis of the EMP content and the Commitments Register with regard to the current environmental authorities, CG's Report, EPBC Act Approval and other relevant project approval conditions = Meetings and workshops with key members of the GLNG Upstream and EPC environmental management teams to identify objectives of the review and areas for improvement = Review and update of the EMP and associated sub-plans including plans relating to the management of key components of CSG field development such as land disturbance, flora and fauna management and pest and weed = Restructuring and streamlining of the EMP and sub-plans for the effective and efficient management of environmental elements during the construction phase of CSG development GLNG Upstream Internal Land Disturbance Approval Process, CSG Fields, Queensland — Santos Ltd = Secondment to Santos for a period of 12 months, working within the Environment and Sustainability Team assisting in developing an ecological survey methodology and GIS data capture framework in accordance with Santos’ Environmental Authorities, EPBC Act Approval conditions and the other relevant statutory requirements = Provision of ecological advice and guidance in developing an internal environmental assessment and approval process for the CSG fields = Review and evaluation of environmental authority conditions for the CSG fields, including a review of rehabilitation final acceptance criteria in context of current published literature for rehabilitation of vegetation communities in the Brigalow Belt Bioregion aurecon Leading. Vibrant. Global.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.