ORDINARY MEETING MINUTES 16 FEBRUARY 2023
34. All building materials containing asbestos products are wrapped and disposed of
in accordance with the Public Health Regulation 2006 and the Environmental
Protection Regulation 2008.
Note: Asbestos is a Regulated Waste. The Department of Environment & Science
licenses businesses that transport asbestos waste, and landfills that accept this
waste.
35. All building materials containing asbestos, including asbestos cement sheeting or
roofing and lagging are removed from the building prior to demolition/relocation.
Plumbing and Drainage
36. It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that
at demolition of a building, the existing sanitary drain upstream from the connection
point for a service provider’s sewerage system must be sealed watertight. This
work is deemed as notifiable Work and must be carried out by a suitably licenced
plumber who must submit an As Constructed plan and Form 4 (Notifiable Works
Form) to the QBCC (Queensland Building Construction Commission) within 10
days of completing the work.
37. A separate development permit for Operational Works landscaping must be
submitted to and approved by Council prior to issue of an application for Building
Approval. The landscape plan is to detail the provision of:
• permanent planters along the upper floor plan terrace area
• permanent planters along central lobby
• internal green walls around internal stairwell
• planter to support vine over pergola
• feature tree and understorey planting of ground level
All landscaping on site is to be maintained for the life of the development.
B. Include the following advisory note in addition to the standard advisory notes :
Activities within Road Reserve/Pathways/Car spaces
1. Safe vehicle and pedestrian access in the vicinity of the development must be
maintained at all times. Should closures of footpath/roads/carspaces be necessary
to carry out construction works, a permit from Council’s Infrastructure Section must
be obtained prior to any works being undertaken.
2. Council encourages the implementation of sustainable and efficient energy
infrastructure to minimise energy consumption and the production of greenhouse
gases. In this regard Council recommends the installation of solar panels for the
development.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Carried unanimously.
Page 14 of 17