Original source · versioned page text
Not Properly Made Submission (Duplicate) Jennifer Sadler MCU12/0216
Jennifer Sadler 181 Forest Acres Drive Lake Macdonald 4563 8 May 2013 Mr Marcus Brennan, Assessment Manager Sunshine Coast Council Locked bag 72 Sunshine Coast Mail Centre 4560 Submission re MCU12/0216 Dear Mr Brennan, I wish to put forward my comments for you to consider in the assessment of the above Development Application for a Material Change of Use at 271 Lake Macdonald Drive. 1. The Notice of Commencement is attached to the fence at Gate 4 of the brickworks site on Lake Macdonald Drive. It is well back from the road next to other signs on the fence and has nothing to dis- tinguish it as being a new sign that would be of interest to anyone other than people who worked at the site. I believe notices alerting the public to a new or changed development must be prominently displayed and this sign is not. By the time the public were aware that there was an MCU lodged at Council for an increase in extraction of clay from the clay pit on Kennedy Drive to be transported to the clay pits on Lake Macdonald Drive the ’comment period’ was already half over not allowing time for proper research into the impacts on locals. Further, locals who would be most impacted by the change in use (those on Hoy Rd, Lake Ridge Court and Racehorse Lane) would have no reason to ever drive by the brickworks and so would never have the opportunity to see the sign even if it were well displayed. 2. In the Development Application Part 2 of 2 ‘Traffic Assessment’ by TTM Consulting (Sunshine Coast) Pty Ltd. It states: 2.2 Haulage Profile ‘TTM have been advised that the proposed rehabilitation of Neales Quarry and White Pit Quarry will involve the extraction of up to 900,000 tonnes (0.90Mt) over a 2 year period. It is understood that the haulage vehicle will be a truck and dog with a payload of 30 tonnes. Over this period it is anticipated that up to 30,000 heavy vehicles will enter and exit the subject site with an anticipated maximum of 50 heavy vehicles per day’. It states in the Information Request Response dated April 2, 2013 ‘The Traffic Impact Assessment Report prepared by TTM Consulting Pty Ltd, included as Attachment 7 of the Planning Assessment Report submitted to Coun- cil, identifies that a total of 60,000 vehicle movements over the life of the project (i.e. 2 years) for the proposed operations will be required to enter and exit the Site in order to haul the extracted material to the receiving sites (i.e. Neales
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.