Operational Works Application OPW19-0033 · OPW19/0033

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (15.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Noosa Council 2/20 Kauri Crescent

PO Box 141 Peregian Springs
Tewantin QLD 4573
QLD 4565 —

|
ter | 18 February 2019

Attention: Development Assessment

Dear Sir/Madam,

APPLICATION FOR DEVELOPMENT PERMIT FOR OPERATIONAL WORKS - VEHICLE CROSSOVER,
REMOVAL OF THREE (3) STREET TREES AND MINOR ROAD RESERVE ALTERATIONS ON LAND
DESCRIBED AS LOT 175 ON SP115740 AT 205 BLUEBERRY DRIVE, BLACK MOUNTAIN, QLD 4563

Property Description: Lot 175 on SP115740
Property Address: 205 Blueberry Drive, Black Mountain, QLD 4563
Development Type: Operational Works for Vehicle Crossover, removal of three (3) street trees

and minor road reserve alterations

Local Government: Noosa Shire Council
Planning Instrument: Noosa Plan (as amended 8 June 2018)
Applicant: Anthony Wardrop and Emily Latham

Please find enclosed our Application for Operational Works approval for the construction of a vehicle
crossover, removal of three (3) street trees and minor road reserve alterations at the above site. A
site visit was carried out on 5 November 2018 with Martin Sergas, Technical Officer — Road Reserves,
Civil Operations, Noosa Council to discuss this application.

This application comprises:

1.
2.
3.

6.

This covering letter;

Completed DA Form 1;

Engineering drawings (layout plan and section) by Callaghan & Toth Engineers showing
location of proposed vehicle crossover;

Arboricultural Appraisal by Consult Arborist Pty Ltd. with commentary regarding the trees
earmarked for removal;

Email from Clint Bevan, Network Integrity Team, Telstra Operations regarding Telstra
services; and

Photographs showing before and after asbestos remediation works.

The prescribed application fee of $478 will be paid to Council upon receipt of an application
reference number.

Page lof 4
Full text of the other 30 pages

Page 2

Background

Considerable deliberation has been given to the location of the proposed vehicle crossover and
other elements the subject of this application, taking into account site conditions/characteristics, the
presence of existing services, and proposed house design. The proposed location has been
discussed with Martin Sergas, our private engineer, certifier and building designer.

This Operational Works application is required as:
* the proposed driveway is considered ‘non-standard’ due to the existing site profile; and
* proposed works include the removal of three (3) street trees; and
* alterations to the profile of the nature strip is also proposed.

Asbestos Removal

In February 2018, pieces of asbestos sheeting were discovered which had been illegally
dumped/hidden on Council’s nature strip at the front of the site. Initial testing and removal works
were completed at our own cost. Further pieces were subsequently discovered, and Noosa Council
then carried out additional removal works over an extensive area spanning 15 metres, and at
considerable financial cost. (Please contact Eddie Stevens, Noosa Council for further information).
The removal works included the removal of a depth of around 100mm of earth and vegetation in the
problem area. Please refer to photographs attached to this application showing the affected area
before and after the remediation works.

Location

As per attached engineering drawings, the location of the crossover has been chosen for the
following reasons:

° To seal the area permanently: Upon completion, the vehicle crossover in this location would
enable area to be sealed permanently by concrete/bitumen which would prevent the risk of
any further asbestos sheeting pieces from coming to the surface in the future. The removal
of the two street trees in this position are required to facilitate these works. These are
referred to as ‘Tl’ in the attached Arboricultural Appraisal.

* Excavation works are already partially complete: Council’s asbestos removal works
required the excavation of approximately 100mm of top soil from the problem area. These
works have in effect, begun the excavation required for a vehicle crossover in this location.

* The underground services are the deepest in this location: The proposed location of the
vehicle crossover is confirmed to be situated where the existing underground Energex and
Telstra services are at the deepest location on the property frontage. This will facilitate the
construction of the crossover with least disturbance.

In addition, it has been concluded that there is no other location along the property frontage which
doesn’t have some degree of conflict. The chosen location is positioned towards the western end of
the property frontage. This is away from the intersection with Watergum Place so as to ensure that
access/egress from both our property and Watergum Place will be uncompromised.

Services

The attached ‘Longitudinal Section’ drawing by Callaghan & Toth engineers, shows the proposed
crossover being in conflict with the existing underground Telstra line position. As a result, the
proposed works have been discussed with Clint Bevan (Network Integrity Team, Telstra), see email

Page 2 of 4

Page 3

attached. Clint has advised the pipe will need to be lowered as per his email attached to this
application dated 30/01/19.

The excavation works for this purpose are required to span 15 metres either side of the proposed
driveway. As a result, we propose that the profile of the vehicle crossover is continued across the
full distance of the affected area {shown outlined in red within Figure 2 of the attached
‘Arboricultural Appraisal’). This will include battering the existing ground and levelling back to match
the proposed crossover profile. The area will then be re-turfed/seeded to re-establish grass
coverage.

These works will:

* facilitate the provision for ongoing mowing maintenance of the nature strip, by reducing the
gradient; and

* help to improve the street aesthetics, by re-establishing the grass cover in the subject area.
The grass in this area is currently non-existent or patchy at most.

Additional Street Tree Removal and Replacement Planting

Please refer to the Arboricultural Appraisal prepared by Matt Duncan at Consult Arborist Pty Ltd.
attached to this application. The two most westerly street trees (referred to as ‘T1’) are earmarked
for removal to facilitate the provision of a vehicle crossover in this location for the reasons given
above.

The third street tree is a Scribbly Gum, Eucalyptus racemose (referred to as ‘T2’), which is situated
within close proximity to the proposed new dwelling. The removal of this tree is required for the
following reasons:

* Safety: The site is in an elevated position and exposed to weather fronts as they permeate
the area. This tree is confirmed to be relatively mature and tall, and as such poses a safety
hazard to the proposed dwelling during periods of bad weather. In the interest of safety, it
is proposed that the tree is removed prior any additional growth, which could place a larger
threat to the future dwelling house.

* Vegetation coverage: There is currently poor grass coverage along the nature strip in the
location of street tree 3. This is partially due to street tree 3 in retaining the
moisture/nutrients from the ground. Removing this tree, and re-turfing/seeding the area
would give grass and vegetation a better chance to re-establish.

® Visibility: Removal will assist in providing clear lines of sight for access/egress of vehicles
into the site improving road and traffic safety.

° Damage: The works required to lower the Telstra pipe/cable will involve excavation in close
proximity to the gum tree and its root system. During these works, damage to the roots of
this tree may be unavoidable, thereby further justifying the need for its removal.

* Replacement Planting: It is accepted that any trees removed will be replaced with more
appropriate species in a more appropriate location. It is envisaged that this can be dealt
with via condition.

Summary

The location of the proposed driveway will:
° seal the ground permanently in an area which has contained asbestos sheeting;
* prevent the chance of any further pieces coming to the surface;

Page 3 of 4

Page 4

* be positioned where excavation works have already been completed as part of the removal
works and where underground services are at their deepest; and
* facilitate the replacement of more appropriate tree species in a more appropriate location.

A wider area of the nature strip can be excavated at the same width as that required for lowering
Telstra cable which will aid ongoing mowing maintenance. A third street tree is earmarked for
removal for safety, to improve grass coverage, visibility and to being damaged from excavation

works in close proximity.

We therefore recommend Council issues Operational Works approval and we look forward to
receiving Council’s favourable decision in due course.

If you have any queries, please do not hesitate to contact me.

Yours faithfully,

Anthony Wardrop
Phone: 0400 384 250
Email: [email protected]

Page 4 of 4

Page 5

DA Form 1 — Development application details
Approved form (version 1.1 effective 22 JUNE 2018) made under section 282 of the Planning Act 2016.

This form must be used to make a development application involving code assessment or impact assessment,
except when applying for development involving building work.
For a development application involving building work only, use DA Form 2 — Building work details.

For a development application involving building work associated with any other type of assessable development
(i.e. material change of use, operational work or reconfiguring a lot), use this form (DA Form 1) and parts 4 to 6 of
DA Form 2 — Building work details.

Unless stated otherwise, all parts of this form must be completed in full and all required supporting information must

accompany the development application.

One or more additional pages may be attached as a schedule to this development application if there is insufficient
space on the form to include all the necessary information.

 

 

 

 

Note: Alf terms used in this form have the meaning given under the Planning Act 2016, the Planning Regulation 2017, or the Development

Assessment Rules (DA Rules).

PART 1 — APPLICANT DETAILS

1) Applicant details

Applicant name(s) (individual or company full name)

Anthony Wardrop and Emily Latham

 

Contact name (only applicable for companies)

 

Postal address (P.0. Box or street address)

2/20 Kauri Crescent

 

Suburb

Peregian Springs

 

 

 

 

 

 

State Queensland

Postcode 4573

Country Australia

Contact number 0400 384 250

Email address (non-mandatory) [email protected]
Mobile number (non-mandatory) As above

 

Fax number (non-mandatory)

 

Applicant's reference number(s) (if applicable)

 

 

2) Owner's consent

2.1) Is written consent of the owner required for this development application?

 

 

KX No — proceed to 3)

C1 Yes — the written consent of the owner(s) is attached to this development application

 

 

 

Queensland

Page 6

PART 2 — LOCATION DETAILS

3) Location of the premises (complete 3.1) or 3.2), and 3,3).as applicable)
Note: Provide: details below-and attach a site‘plan for any or all premises part of the development application: For further information: see DA

Forms Guide.
PP cilnci-iec-(e(o|xosiom-s ae telereie eyiel a,

Street address AND lot on plan (ei! iots must be listed), or

Street address AND lot on plan for an adjoining or adjacent property of the premises (appropriate for development in
water but adjeining or adjacent to land e.g. jetty, pontoon; ail lots must be fisted).

 

 

 

 

 

 

 

 

 

 

 

 

 

UnitNo. j Street No. | Street Name and Type Suburb
) - 205 Blueberry Drive Black Mountain

a
Postcode | Lot No. Plan Type and Number (e.g. RP. SP) Local Government Area(s)
4563 175 $P115740 Noosa Shire Council
UnitNo. | StreetNo. | Street Name and Type Suburb

b)
Postcode | Lot No. Plan Type and Number (e.g. RP, SP) Local Government Area(s)

3 8} 6

cate annel dredging CHE gato!

esi Car} et of coordinate ER ede af.coo p

(1 Coordinates of premises by longitude and latitude

 

 

 

 

 

 

Longitude(s) Latitude(s) Datum Local Government Area(s) ff applicable)
C1 wess4
C1 cpaga
7] Other:
(J Coordinates of premises by easting and northing
Easting(s) Northing(s) Zone Ref. ; Datum Local Government Area(s) (if applicable)
[154 Cl wese4

1155 (1 pasa
L156 (J Other:

 

 

 

 

3.3) Additional premises

 

(1 Additional premises are relevant to this development application and their details have been attached in a
schedule to this application

1 Not required

4) Identify. any of the following that apply tothe premises and provide any relevant details

(J In or adjacent to a water body or watercourse or in or above an aquifer

 

 

 

 

 

 

 

 

 

 

Name of water body, watercourse or aquifer: N/A
(1 On strategic port land under the Transport Infrastructure Act 1994

Lot on plan description of strategic port land: N/A
Name of port authority for the lot: N/A
[J ina tidal area

Name of local government for the tidal area (if applicable): N/A
Name of port authority for tidal area (f appiicabie): N/A
(J On airport land under the Airport Assets (Restructuring and Disposal) Act 2008
Name of airport: N/A

 

 

 

Pann >

Page 7

 

(1 Listed on the Environmental Management Register (EMR) under the Environmental Protection Act 1994
EMR site identification: N/A

(1 Listed on the Contaminated Land Register (CLR) under the Environmental Protection Act 1994

CLR site identification: N/A

 

 

 

 

5) Are there any existing easements over the premises?

   

Note: Easement uses. vary throughout Seen endare to he st correctly and accurately, For further information.on easements and
how they may affect the proposed devel of O amelie?
[1] Yes — All easement ‘ovations. types and dimensions are included in plans submitted with this development
application
Xj No

 

PART 3 —- DEVELOPMENT DETAILS

Section 1 — Aspects of development
ee eeu eles cle tte ileieelcnics(0) elt seit ects Oo eee mee
a) What is the type of development? (tick only one box)

    

 

CO Material change of use (] Reconfiguring a lot [El Operational work (1 Building work
b) What is the approval type? (tick only one pox)
Development permit [7] Preliminary approval (1 Preliminary approval that includes

a variation approval

 

c) What is the level of assessment?
Code assessment (A tmpact assessment (requires public notification)

d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3
lots}:

Proposed vehicle crossover, removal of three (3) street trees and minor road reserve alterations

 

 

e) Relevant plans
Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms quide:
Relevant plans.

Relevant plans of the proposed development are attached to the development application

 

6.2) Provide details about the second development aspect

a) What is the type of development? (tick only ane box)

 

(1 Material change of use (J Reconfiguring a lot (J Operational work (1 Building work

b) What is the approval type? (tick only one box)

(J Development permit ( Preliminary approvai (7 Preliminary approval that includes a variation
approval

 

c) What is the level of assessment?
(7 Code assessment (J Impact assessment (requires public notification)

 

d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 tot into 3
Jots):

e) Relevant plans

Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms Guide:
Relevant plans.

( Relevant plans of the proposed development are attached to the development application

 

 

 

Pann 2

Page 8

 
 

6.3) Additional aspects of development

( Additional aspects of development are relevant fo this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application

EX] Not required

 

 

Section 2 — Further development details
2) Does the proposed development application involve any:of'the following?

   
   

 

 

 

Material change of use (1 Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot (1 Yes — complete division 2

Operational work Yes — compleie division 3

Building work (1 Yes — complete DA Form 2 ~ Building work details

 

 

 

Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.

SEP Bitoni ls\on th om 109) Ocal et ce cee et ois Se
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor

   

 

 

proposed use (include each definition in a new row) units f applicable) area (m’)
(# applicable)

 

 

 

 

 

 

  

8:2) Does the proposed use involve the use of existing buildings on the premises? -
yes
[No

 

 

 

 

 

 

 

Division 2 ~ Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.

9.1): What is the total number.of.existing lots making up.the premises?.

: 9.2) What is the nature. of the lot Ceonieie ene ie applicable boxes)

 
  

   
     
     

 

 

C1 Subdivision (complete 10)) (J Dividing tand into parts by agreement (complete 11))
(1 Boundary realignment (complete 12)) (1. Creating or changing an easement giving access to a lot
from a construction road (complete 13))

 

40):Subdivision :

    

     

10:1) For this development; how many lots are being: created:and whatis the intended use of those:lots:
Intended use of lots created Residential Commercial Industrial Other, please specify:

Number of lots created
10.2) Will the subdivision be staged?

(I Yes — provide additional detaiis below
[CINo

How many stages wil! the works include?

 

 

 

 

 

 

What stage(s) will this development application
apply to?

 

 

 

 

Maan 4

Page 9

  

11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the
parts? 5

Intended use of parts created | Residential Commercial | Industrial Other, please specify:

    
       
 

             

 

 

 

Number of parts created | |

 

42) Boundary realignment

12.1), What’are the current and proposed areas for.each lot comprising the.premises?
Current lot Proposed lot
Lot on plan description Area (m’) Lot on plan description Area (m*)

 

 

 

 

 

 

 

 

 

 

12.2) What is.the reason for the:boundary realignment?

13): What are the dimensions and nature of any existing easements. being changed:and/or any: proposed easement?

(Ge moerse RL B ee eC UL fen)

Existing or Width (m) | Length (m) | Purpose of the easement? ¢e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement

 

 

 

 

 

 

 

 

 

 

Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.

14.1) Whatis.the nature.of the operational-work?

   
    

     
  
   
  
  
  

 

(1 Road work (1 Stormwater ( Water infrastructure
(1 Drainage work XX Earthworks C1 Sewage infrastructure
[Xj Landscaping C1 Signage Clearing vegetation

 

(1 Other — please specify: |

14.2) |s the operational work necessary to facilitate the creation of new lots? CepS eto
(1 Yes ~ specify number of new lots:
EI No

14.3) What is the monetary value of the. proposed operational work? (include GST, materials and /abour)
Approximately $10,000

 
  
   

    
   

 

 

  
   
   

 

PART 4 —- ASSESSMENT MANAGER DETAILS

Bre) Colusa ata: Pe onion manager(s) who willbe Peete) this development Eis diecitent

  

The local government — Noosa Shire Council

 
 

16) Has the local government agreed to apply a superseded planning. scheme for this development application?

(1 Yes —a copy of the decision notice is attached to this development application

(1 Local government is taken to have agreed to the superseded planning scheme request — relevant documenis
attached

No

      
   

 

Rane &

Page 10

PART 5 ~ REFERRAL DETAILS

17) Do any aspects of the osed development require referral for any referral requirements?

iifelcmees pment application wil e referral if prescribed &

 

No, there are no referral requirements relevant to any development aspects identified in this development
application — proceed to Part 6

 

Matters requiring referral to the Chief Executive of the Planning Regulation 2017:

( Clearing native vegetation

C] Contaminated land (unexploded ordnance)

(_] Environmentally relevant activities (ERA) (only if the ERA have not been devolved to a local government)
(1 Fisheries — aquaculture

C Fisheries — declared fish habitat area

(Co Fisheries — marine plants

(1 Fisheries — waterway barrier works

(7) Hazardous chemical facilities

(1 Queensland heritage place (cn or near a Queensland heritage place)

(1 Infrastructure — designated premises

(1 infrastructure — state transport infrastructure

(1 Infrastructure — state transport corridors and future state transport corridors

(1 Infrastructure — state-controlled transport tunnels and future state-controlled transport tunnels
(71 infrastructure — near a state-controlled road intersection

(1 On Brisbane core port land near a State transport corridor or future State transport corridor
(J On Brisbane core port land—ERA

(1 On Brisbane core port land — tidal works or work in a coastal management district

(1 On Brisbane core port land — hazardous chemical facility

(] On Brisbane core port land — taking or interfering with water

(1 On Brisbane core port land — referable dams

(1 On Brisbane core port land - fisheries

(1 Land within Port of Brisbane’s port limits

(1 SEQ development area

(SEQ regional landscape and rural production area or SEQ rural living area — tourist activity or sport and
recreation activity

(FJ SEQ regional landscape and rural production area or SEQ rural living area — community activity
(1) SEQ regional landscape and rural production area or SEQ rural living area — indoor recreation
(7) SEQ regional landscape and rural production area or SEQ rural living area — urban activity

(I SEQ regional landscape and rural production area or SEQ rural living area — combined use

(1 Tidal works or works in a coastal management district

( Reconfiguring a lot in a coastal management district or for a canal

(C1 Erosion prone area in a coastal management district

(1 Urban design

(1 Water-related development — taking or interfering with water

LJ Water-related development — removing quarry material trom a watercourse or lake)

7] Water-related development — referable dams

[J Water-related development — construction of new levees or modification of existing levees (category 3 levees only)
(J Wetland protection area

 

Matters requiring referral to the local government:

(Airport land

(7 Environmentally relevant activities (ERA) (oniy if the ERA have been devolved to local government}
(1 Local heritage places

 

 

 

Paane

Page 11

 

Matters requiring referral to the chief executive of the distribution entity or transmission entity:
CJ Electricity infrastructure

Matters requiring referral to:

* The Chief executive of the holder of the licence, if not an individual

¢ The holder of the licence, if the holder of the licence is an individual

(J Oil and gas infrastructure

Matters requiring referral to the Brisbane City Council:

[1] Brisbane core port land

Matters requiring referral to the Minister under the Transport Infrastructure Act 1994:
(1 Brisbane core port land (inconsistent with Brisbane port LUP for transport reasons)
(] Strategic port land

Matters requiring referral to the relevant port operator:

(1) Land within Port of Brisbane’s port limits (below high-water mark)

 

 

 

 

 

Matters requiring referral to the Chief Executive of the relevant port authority:
(1 Land within limits of another port (below high-water mark)

Matters requiring referral to the Gold Coast Waterways Authority:
(J Tidal works, or work in a coastal management district in Gold Coast waters

 

 

Matters requiring referral to the Queensland Fire and Emergency Service:
(J Tidal works marina (more than six vessel! berths)

 

 

18) Has any referral agency provided a referral response for this development application?
(1) Yes — referral response(s) received and listed below are attached to this development application

No

Referral requirement Referral agency Date of referral response
N/A

   

 

 

 

 

 

 

identify and describe any changes made to the proposed development application that was the subject of the
referral response and the development application the subject of this form, or include details in a schedule to this
development application (if applicable).

N/A

 

 

 

 

PART 6 — INFORMATION REQUEST

 

19) Information request under Part 3 ofthe DA Rules

[I | agree to receive an information request if determined necessary for this development application

(J 1 do not agree to accept an information request for this development application

Note: By not agreeing to accept an information request |, the applicant, acknowledge:

* that this development application will be assessed and decided based on the information provided when making this development application
and the assessment manager and any referral agencies relevant to the development application are not obligated under the DA Rules to
accept any additional information provided by the applicant for the development application unless agreed to by the relevant parties

* Part 3 of the DA Rules will still apply if the application is an application listed under section 11.3 of the DA Rules.

Further advice about information requests is contained in the DA Forms Guide.

 

Dann 7

Page 12

PART 7 — FURTHER DETAILS

 

20) Are there any associated development applications or current approvals? (e.g. preliminary approval)

 

C1 Yes — provide details below or include details in a schedule to this development application
XI No

List of approval/development Reference number Date Assessment
application references manager

 

 

CD Approval
LD Development application

LC Approval
C1 Development application

 

 

 

 

 

21) Has the portable long service leave levy been paid? (only applicable to development applications involving building work or

 

operational work)

1 Yes —a copy of the receipted QLeave form is attached to this development application

(No —I, the applicant will provide evidence that the portable long service leave levy has been paid before the
assessment manager decides the development application. | acknowledge that the assessment manager may give
a development approval only if | provide evidence that the portable long service leave levy has been paid

XI Not applicable (e.g. building and construction work is less than $150,000 excluding GST)

Amount paid Date paid (dd/mm/yy) QLeave levy number
$

22) Is this development application in response to a show cause notice or required as a result of an enforcement
notice?

(1 Yes — show cause or enforcement notice is attached

XI No

 

 

 

 

 

   

 

 

 

23) Further legislative requirements
Environmentally relevant activities

23.1) Is this development application also taken to be an application for an environmental authority for an
UN RUCLNM CAL im Celia (aia d-8 ltl \ foils MEMO Mla aig ice pig Clem fe ce ege meee’ ed

 

(C1 Yes — the required attachment (form ESR/2015/1791) for an application for an environmental authority
accompanies this development application, and details are provided in the table below

KX] No

Note: Application for an environmental authority can be found by searching “ESR/2015/1791" as a search term at www.gid.gov.au. An ERA
requires an environmental authority to operate. See www_business gid gov. au for further information.

Proposed ERA number: Proposed ERA threshold:
Proposed ERA name:

 

 

 

 

Oo Multiple ERAs are applicable to this development application and the details have been attached in a
schedule to this development application.

Hazardous chemical facilities

 

23.2) Is this development application for a hazardous chemical facility?

(C1 Yes — Form 69: Notification of a facility exceeding 10% of schedule 15 threshold is attached to this development
application

XI No

Note: See www.business.gid.gov.au for further information about hazardous chemical notifications.
Clearing native vegetation

 

 

23.3) Does this development application involve clearing native vegetation that requires written confirmation that
the chief executive of the Vegetation Management Act 1999 is satisfied the clearing is for a relevant purpose under

 

Naan o

Page 13

section 22A of the Vegetation Management Act 1999?

LJ Yes — this development application includes written confirmation from the chief executive of the Vegetation
Management Act 1999 (s22A determination)

No

Note: 1. Where a development application for operational work or material change of use requires a s22A determination and this is not included,

the development application is prohibited development.
2. See hitps/www_gid.gov.au/environmenthand/vegetation/applying for further information on how to obtain a s22A determination.

Environmental offsets

23.4) Is this development application taken to be a prescribed activity that may have a significant residual impact on
a prescribed environmental matter under the Environmental Offsets Act 2014?

1 Yes — | acknowledge that an environmental offset must be provided for any prescribed activity assessed as
having a significant residual impact on a prescribed environmental matter
No

Note: The environmental offset section of the Queensland Govemment’s website can be accessed at www.qld.gov.au for further information on
environmental offsets.

Koala conservation

23.5) Does this development application involve a material change of use, reconfiguring a lot or operational work
within an assessable development area under Schedule 10, Part 10 of the Planning Regulation 2017?

1 Yes

XI No

Note: See guidance materials at www.des.g/d.gov.au for further information.
Water resources

23.6) Does this development application involve taking or interfering with underground water through an
artesian or subartesian bore, taking or interfering with water in a watercourse, lake or spring, or taking
overland flow water under the Water Act 2000?

(1 Yes — the relevant template is completed and attached to this development application and | acknowledge that a
relevant authorisation or licence under the Water Act 2000 may be required prior to commencing development

XI No

Note: Contact the Department of Natural Resources, Mines and Energy at www.dnrme.gid.gov.au for further information.

DA templates are available from https:/planning.dsdmip.gid.gov.au/. if the development application involves:

* Taking or interfering with underground water through an artesian or subartesian bore: complete DA Form 1 Template 1

* Taking or interfering with water in a watercourse, lake or spring: complete DA Form1 Template 2

* Taking overland flow water: complete DA Form 1 Template 3.

Waterway barrier works
23.7) Does this application involve waterway barrier works?

C1 Yes — the relevant template is completed and attached to this development application
No

DA templates are available from httos://planning.dsdmip.gid.gov.au/. For a development application involving waterway barrier works, complete
DA Form 1 Template 4.

Marine activities

23.8) Does this development application involve aquaculture, works within a declared fish habitat area or
removal, disturbance or destruction of marine plants?

(1 Yes — an associated resource allocation authority is attached to this development application, if required under
the Fisheries Act 1994

KX] No

Note: See guidance materials at www.daf.qid .gov.au for further information.

Quarry materials from a watercourse or lake

23.9) Does this development application involve the removal of quarry materials from a watercourse or lake
under the Water Act 2000?

(1 Yes — 1 acknowledge that a quarry material allocation notice must be obtained prior to commencing development

XI No

 

 

naan 0

Page 14

 

Note: Contact the Department of Natural Resources, Mines and Energy at www.dnrme.gid.gov.au and www.business.gid.gov.au for further
information.

Quarry materials from land under tidal waters

23.10) Does this development application involve the removal of quarry materials from land under tidal water
under the Coastal Protection and Management Act 1995?

 

(1 Yes —! acknowledge that a quarry material allocation notice must be obtained prior to commencing development
XI No

Note: Contact the Department of Environment and Science at www.des.g/d.gov.au for further information.

   
   

Referable dams

23.11) Does this development application involve a referable dam required to be failure impact assessed under
section 343 of the Water Supply (Safety and Reliability) Act 2008 (the Water Supply Act)?

C1 Yes — the ‘Notice Accepting a Failure Impact Assessment from the chief executive administering the Water
Supply Act is attached to this development application

KX] No

Note: See guidance materials at www.dnrme.qid_.gov.au for further information.
Tidal work or development within a coastal management district

23.12) Does this development application involve tidal work or development in a coastal management district?

C1 Yes — the following is included with this development application:

C1 Evidence the proposal meets the code for assessable development that is prescribed tidal work (only required
if application involves prescribed tidal work)

LIA certificate of title
XI No
Note: See guidance materials at www.des.gid.gov.au for further information.
Queensland and local heritage places
23.13) Does this development application propose development on or adjoining a place entered in the Queensland
heritage register or on a place entered in a local government's Local Heritage Register?

(1 Yes — details of the heritage place are provided in the table below
IX] No

Note: See guidance materials at www.des.g/d.gov.au for information requirements regarding development of Queensiand heritage places.

 

 

   
   
   

 

Name of the heritage place: Place ID:
TCs
23.14) Does this development application involve a material change of use for a brothel?

(1 Yes - this development application demonstrates how the proposal meets the code for a development
application for a brothel under Schedule 3 of the Prostitution Regulation 2014

XI No
Decision under section 62 of the Transport Infrastructure Act 1994

 

23.15) Does this development application involve new or changed access to a state-controlled road?

U1 Yes - this application will be taken to be an application for a decision under section 62 of the Transport
Infrastructure Act 1994 (subject to the conditions in section 75 of the Transport Infrastructure Act 1994 being
satisfied)

XI No

 

 

 

PART 8 — CHECKLIST AND APPLICANT DECLARATION

Pann 4n

Page 15

24) Development application checklist

| have identified the assessment manager in question 15 and all relevant referral

requirement(s) in question 17 Yes
Note: See the Planning Regulation 2017 for referral requirements

If building work is associated with the proposed development, Parts 4 to 6 of DA Form 2-— [Yes
Building work details have been completed and attached to this development application KX Not applicable

 

 

Supporting information addressing any applicable assessment benchmarks is with
development application

Note: This is a mandatory requirement and includes any relevant templates under question 23, a planning report Kl Yes
and any technical reports required by the relevant categorising instruments (e.g. local government planning
schemes, State Planning Policy, State Development Assessment Provisions). For further information, see DA

Forms Guide: Planning Report Template.

Relevant plans of the development are attached to this development application

Note: Relevant plans are required to be submitted for all aspects of this development application. For further Ki Yes

information, see DA Forms Guide: Relevant plans.

The portable long service leave levy for QLeave has been paid, or will be paid before a OYes
development permit is issued (see 21)) KX Not applicable

 

 

 

25) Applicant declaration

[XJ By making this development application, | declare that all information in this development application is true and

correct

{Xl Where an email address is provided in Part 1 of this form, | consent to receive future electronic communications

from the assessment manager and any referral agency for the development application where written information is

required or permitted pursuant to sections 11 and 12 of the Electronic Transactions Act 2001

Note: it is unlawful to intentionally provide false or misleading information.

Privacy — Personal information collected in this form will be used by the assessment manager and/or chosen

assessment manager, any relevant referral agency and/or building certifier (including any professional advisers

which may be engaged by those entities) while processing, assessing and deciding the development application.

All information relating to this development application may be available for inspection and purchase, and/or

published on the assessment manager's and/or referral agency’s website.

Personal information will not be disclosed for a purpose unrelated to the Planning Act 2016, Planning Regulation

2017 and the DA Rules except where:

* such disclosure is in accordance with the provisions about public access to documents contained in the Planning
Act 2016 and the Planning Regulation 2017, and the access rules made under the Planning Act 2016 and
Planning Regulation 2017; or

* required by other legislation (including the Right to Information Act 2009); or

* otherwise required by law.

This information may be stored in relevant databases. The information collected will be retained as required by the

Public Records Act 2002.

 

 

 

 

PART 9 — FOR OFFICE USE ONLY

 

 

Date received: [sd Reference number(s): [ |

Notification of engagement of alternative assessment manager

 

Prescribed assessment manager

 

Name of chosen assessment manager

 

Date chosen assessment manager engaged

 

Contact number of chosen assessment manager

 

Relevant licence number(s) of chosen assessment
manager

 

 

 

 

 

QLeave notification and payment

Rana 44

Page 16

 

Note: For completion by assessment manager if applicable

Description of the work

 

QLeave project number

 

Amount paid ($)

 

Date paid

 

Date receipted form sighted by assessment manager

 

 

Name of officer who sighted the form

 

 

 

Daan ia

Page 17

Page 18

 

 

          

[DRIVEWAY CROSSOVER TO|
NC STD OWG 9005

[EXISTING ENERGEX LOCATED
AT 0.8en-1,0m COVER

 

 

EXISTING TELSTRA TO BE|
LOWERED TO ACHIEVE MINIMUM|

0.3m COVER}

 

 

CURVE TO NC

 

   

NATURAL SURFACE]

[BATTER BACK TO NATURAL.
SURFACE AT 4,

PROPOSED GARAGE

MINIMUM FFL 161.100

 

(05 APPROX

 

 

 

 

 

 

 

 

STD DWG 9019
E
S| 7.8% 49.3% 25,00%| 12.50% 0.0%
DATUM RL 157,000
= x
rr a g
CUT/FILL (+=CUT) 2 s 2 s ¢
ee 5 a B
NEW DRIVEWAY LEVEL | &) | 3 g 3 2 &
Ses
23 2 ay} 00CUR 3
| asl 3 g ae] =z 3
SURFACE LEVEL ae # = 3 2
aig g 3 esl =
S| o| ol] | So ea ct}

CHAINAGE

 

 

 

 

 

 

 

 

 

 

 

 

(Callaghan & Toth )

Environmental &

| Hydraulic Engineers
goals Bat
\ 8/41 Sunshine Beach Rood

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FS

 

‘COMPUTER DIRECTORY

 

 

 

FOR APPROVAL

 

Shect 2 of 2 sheate

 

drawing number

1901-02

 

 

 

 

dots _18th JANUARY 2019 JS

 

 

 

Page 19

 

ARBORICULTURAL

Address:

Commissioned by:

Project:
Date:

Prepared by:

TODAY’S TREES FOR TOMORROW

APPRAISAL

205 Blueberry Drive
Black Mountain, QLD, 4563

Mr Anthony Wardrop
Driveway and Road Reserve Configuration

7/02/2019

Matthew Duncan
Director / Principal Arborist
AQF Level V, TRAQ, QMQAA

e: [email protected]
m: 0450 355 770

ABN: 68 153 548 531

 

Page 20

Consult Arborist

 

This document was prepared for the sole use of the client, Mr Anthony Wardrop and any
regulatory agencies involved in this project. No other party should rely on this information
without the prior written consent of Consult Arborist.

The findings laid out in this report are valid for 12 months from the date of the assessment.

If the advice and recommendations made in this report are not strictly adhered to, no
responsibility will be taken for the continuing health and condition of retained trees. Trees are
dynamic living organisms that respond to changes in their environs; repeat assessments are
key to maintaining tree vitality, structural integrity and to reduce any potential risk they may
pose.

COPYRIGHT

This report/document is subject to copyright laws and penalties @280c per word per incident,
no part may be reproduced or used without the written permission of Consult Arborist Pty Ltd.
No responsibility will be accepted by Consult Arborist Pty Ltd for unauthorised or partial use
of this report.

General Permission of use as subject to Consult Arborist Pty Ltd copyrights:
1. Customer permission:
No more than three hard copies to exist at any one time.
2. Customer email permissions:
Must be original PDF format and limited to agreed Parties with direct and vested
interest in the case.

DOCUMENT CONTROL

The latest approved version of this 19_02_07_AA 205 Blueberry Drive should be available to
all relevant personnel in consultation with Consult Arborist Pty Ltd.

Each new revision should be distributed to all key personnel for review and endorsement.

All individuals working near protected trees are to be made aware of this document and it is
the responsibility of the individual to implement and/or adhere to the recommendations and
guidelines.

 

 

 

 

 

 

 

 

 

 

19 02_07_AA_205 Blueberry Drive

Page 21

Consult Arborist

 

TABLE OF CONTENTS

 

Copyright
Document Control 2.0.2... eee eecececccecceceeeeeeeseeeeeeeseeeseeseaeeeaeeesueeeaaeeasesaeeseseneeeseeeenseeneeeseeseeeea 2
1

2
3
4

5

 

5.3 Arboricultural Proposal.............cecccececeeceseeseceesesesesseeeescscesseeeesseeseeeseeaseeeeeeeeaeaeeeeaes g
GB REFEFENCES! oe. eee cece eeececeesceneeeeeeseeaeeeecaeeeceesececaeeaetssesaeesetsesaeseeesaeesteeeseetseseeesaeesetensess 10
7 Assumptions and Disclaimer .............ccccceccecceceeceeeeeceeeeeeseeeeceeeseeseseeseseeeesaeeseessenesteessseaes 10
Ppp 1 Ceti TB rca cacnssnessnearsseonacncasnenenceenascaunncewexsic macanatenex silences 11

 

19_02_07_AA_ 205 Blueberry Drive Page 3 of 11

Page 22

Consult Arborist

1 RIEF

mi
W

This report was commissioned by, Anthony Wardrop the property owner in January 2019.
Consult Arborist Pty Ltd has been requested to carry out an independent Arboricultural
Appraisal and provide arboricultural advice regarding the Noosa Council street trees located
on the frontage of the site, 205 Blueberry Drive, Black Mountain.

The aim of this report is to provide information on the current condition of the trees and to
assess their suitability for future retention taking into consideration the proposed works, tree
species and future use/occupancy of the site.

This report is to be used as supporting information for the Noosa Council Operational Works
application to undertake minor earthworks and the construction of a driveway.

Matthew Duncan, the Director and Principal Arborist of Consult Arborist, undertook the Visual
Tree Assessment of the site from a ground level on Friday, 1 February 2019. Matthew holds
an AQF Level 5 (AHC50510) Diploma in Arboriculture, an International Society of
Arboriculture’s Tree Risk Assessment Qualification 2015 and has worked in the arboricultural
industry since 1994. Since its establishment in 2011, Consult Arborist has been engaged to
provide arboricultural advice and guidance on private, civil and capital works projects from
cross-sector clients throughout SEQ.

3 SCOPE AND LIMITATIONS

A basic Visual Tree Assessment was performed on the subject trees to determine their health,
structure and suitability for retention within their current surroundings. This included a visual
assessment of the surrounding area and the subject tree’s structure and health, from a ground
level. It includes the use of basic tools and techniques, i.e. cavity probing, minor root collar
excavation, measuring tapes and devices and photography to gather information.

The timeframe for this report is the inspection period; re-inspection should occur 1 year from
this inspection. No additional specialist equipment was used, no conclusive comments on what
may have or may be happening within the internal structure of the tree will be made. No tissue
or soil samples have been collected or submitted for testing.

The information contained in this report is based on a visual inspection of each tree and its
location, species, health and condition at the time of inspection unless otherwise stated. It is
the author's opinion and is a ‘snapshot in time’ of the specific tree's health and condition at the
time of the inspection and no guarantee can be given that faults or issues may not arise in the
future.

The relevant tree information has been recorded to be used as a functional proactive tool to
determine a safe management strategy for the trees, taking into account past works, site
activities, age and location. See Site Plans and photographs for tree locations.

19_02_07_AA 205 Blueberry Drive Page 4 of 11

Page 23

A <

SITE DESCRIPTION AND FINDINGS

¢

The three subject trees referred to in this report are identified as T1 and T2. T1 includes a
planted Giant Water Gum, Syzygium francisii, and a self-seeded Wattle, Acacia species,
located towards the western side of the site and directly on the alignment of the proposed
driveway. T2 is a planted Scribbly Gum, Eucalyptus racemosa, positioned centrally adjacent
the Lot frontage towards the toe of the batter that makes up the sloping road reserve.

The Lot is vacant and was recently purchased with the view to constructing a residential
dwelling towards the front of the site. The rear/northern section of the site slopes steeply down
to a stormwater catchment area and creek. | have been advised the steepness of the road
reserve slope is beyond the planning standards and is currently non-compliant.

In the past, a quantity of asbestos was dumped on the site. The owner and Noosa Council
have both on differing occasions acted to remove the asbestos, but | was informed that small
pieces can still be found on the site.

During the asbestos removal process turf and soil from around T2 was removed by Noosa
Council exposing and impacted the tree's surface root system. Damaged and exposed roots
can still clearly be seen on site. These works have also led to minor erosion and with sub-
soil/rock exposed is preventing the establishment of turf.

On approaching Noosa Council, the owner has been advised that a driveway on a non-
standard alignment would not be approved and that the driveway should be positioned towards
the western side of the property at 90 degrees to the kerb, rather than angled, and not to be
opposite the junction with Watergum Place.

With the site to be used as a long-term family residence, the owner seeks to undertake works
to rectify the steep non-compliant road reserve so that is safe to maintain. These works would
require the removal of the ridge that runs along the frontage of the site. The site currently
slopes steeply from the kerb up to the property boundary and then slopes down the length of
the Lot to the north. The proposal by the owner is to reduce the ridge the create a more level
frontage to the site thus reducing the slope to the road reserve. As part of these works, the
underground services are to be repositioned and the area landscaped/turfed.

19_02_07_AA_205 Blueberry Drive — Page 5 of 11

Consult Arborist

Page 24

Consult Arborist

4.1 Site PLANS
Plans are not to scale and is to be used in conjunction with the information within this

assessment results.

 

Figure 1: Google site plan overview

  
 
 
 

 

\ a9
a6,
\ ONSITE SEWERAGE
Ooszst TREATMENT POSITION TO

BE CONFIRMED ON SITE

8507 wall

|
x

Figure 2: Site plan extract showing the subject trees and
proposed dwelling and driveway design.

19_02.07_AA 205BlueberryDrive = sssSsS~S "Page 6 of 11

Page 25

Consult Arborist

 

Site Topography

[Earth works 9

 

Picture 1: Site overview with proposed earthworks to reduce the ridge in orange

 

19_02_07_AA_ 205 Blueberry Drive Page 7 of 11

Page 26

Consult Arborist

 

5 ARBORICULTURAL APPRAISAL

5.1 11

Tree 1 is a combination of two plants growing from the same location and incorporates an
establishing Giant Water Gum, Syzygium francisii, and a self-seeded Wattle, Acacia species.
Both of these trees are directly located within the path of the proposed driveway and have had
the ground scrapped around them to remove the asbestos in the past.

  

Picture 2: Trees 1 and Driveway alignment Picture 3: Tree 2 and minor earthworks

5.2 72

Tree 2 is an early-mature planted Scribbly Gum, Eucalyptus racemosa, in the past works to
remove the asbestos has removed turf and soil from the tree's root zone with exposed roots
remaining. These works do not appear to have caused the tree harm at this stage, however
the effects of root damage can manifest over a number of years rather than months. The
proposed minor earthworks the reduce the ridge and slope are likely to intrude on the tree to
depth, up to an estimated 40% of the tree's calculated root zone of 3.6m radius. This level of
encroachment is not recommended and is contrary to AS4070-2009 Protection of trees on
development sites.

If retained, and knowing the species habits, it is likely that this tree will cause its own issues
for the residents living adjacent to it, including continuous debris drop and sporadic and
unpredictable branch failure that increases over time as the tree ages. It will also develop a
root system that is likely to cause damage to the kerb and channel in the coming years. The
poor/shallow soils found on the cut of the road reserve will not support a deep rooting system
and only promote surface spreading roots.

 

19_02_07_AA_205 Blueberry Drive Page 8 of 11

Page 27

Consult Arborist

 

5.3 ARBORICULTURAL PROPOSAL

To complete the proposed works described above trees, T1 and T2 will be directly impacted
rendering them unsuitable for retention and thus requiring removal.

It is proposed that trees T1 and T2 are removed to due past root interference, design conflict
and road reserve reconfiguration. Replacement trees should be planted after the earthworks
have been completed.

Due to the nature of the shallow soils, it is recommended that oversized planting pits should
be excavated and filled with quality topsoil to provide the new trees with the best opportunity
to establish and flourish.

The suggested replacement tree species are offered to continue the current streetscape
theme and should be planted on the standard alignment 1000-1500mm behind the kerb with
the final positioned to be confirmed.

2 x 300mm / 451 pot size:

Giant Water Gum, Syzygium francisii
Brush Box, Lophostemon confertus

19_02_07_AA 205Blueberry Drive ~ Page 9 of 11

Page 28

Consult Arborist

 

6 REFERENCES:

Australian Standards AS 4373 — 2007 Pruning of amenity trees

ISA Tree Risk Assessment

Wild Plants of Greater Brisbane — Queensland Museum

Noosa’s Native Plants — Stephanie Haslam, Second Edition

Evaluating Tree Defects — A Field Guide by Ed Hayes, Second Edition

Body Language of Trees - Research for Amenity Trees, Claus Mattheck

Smiley E. Thomas, Nelda Matheny and Sharon Lilly April 2012. Tree Risk Assessment: Levels of Assessment
Matheny Nelda and Jim Clark Feb 2009. Tree Risk Assessment: What we know (and What we Don’t Know)

7 ASSUMPTIONS AND DISCLAIMER

This information contained in this report has been prepared on an independent basis, free of any bias and represents the honest
opinion of the consulting arborist.

All data is based on visual inspection of the tree/s and its/their location at the time of writing, unless otherwise stated, and contains
opinions, advice and recommendations based on information and data gathered from site inspections carried out by the author
and information supplied by the Client (Anthony Wardrop).

All information received from the Client shall be deemed to be true, accurate and up to date.

To the extent permitted by law, you agree Consult Arborist Pty Ltd is not liable to you or any person or entity for any loss of or
damage caused or alleged to have been caused (including loss or damage resulting from negligence) either directly or indirectly,
by your use of the information made available in this report. In no event will the author be liable to you for any lost revenue or
profits, or for special, indirect, consequential or incidental damage (however caused and regardless of the theory of liability)
arising out of or related to your use of that information, even if the author has been advised of the possibility of such a loss or
damage.

Consult Arborist cannot be held responsible for the effects of non-conformance works performed, by unsuitably qualified staff or
without the supervision of Consult Arborist.

Unless otherwise stated this report cannot be used within a court of law or any legal situation without the prior consent of Consult
Arborist Pty Lid. The author shall not be required to give testimony or to attend court by reason of this report unless subsequent
contractual arrangements have been made.

The information contained in this report refers only to the tree/s that were inspected on 1/02/2019 and reflects the condition of
the tree/s at the time of the inspection.

There is no warranty or guarantee, expressed or implied, that the problems or deficiencies of the plants or property in question
may not arise in the future. Likewise, remedial treatments cannot be guaranteed.

Arboriculturalists cannot detect every condition that could possibly lead to the structural failure of a tree. Trees are living
organisms that fail in ways we do not fully understand. Conditions are often hidden within trees and below ground. Consult
Arborist Pty Ltd and the author cannot guarantee that a tree will be healthy or safe under all circumstances, or for a specified
period of time. This report does not take into consideration the possibility of extreme weather or other events over which Consult
Arborist Pty Ltd has no control.

Treatment, pruning and removal of trees may involve considerations beyond the scope of the Arboriculturalists services, such as
property boundaries and ownership, disputes between neighbours, sight lines, landlord-tenant matters and related. Consult
Arborist Pty Ltd cannot take such issues into account unless the complete and accurate information is given to them. Likewise,
Consult Arborist Pty Ltd cannot accept any responsibility for the authorization or non-authorization of any recommended treatment
or remedial measure.

Arboriculturalists are tree specialists who use their education, knowledge, training and experience to examine trees, recommend
measures to enhance the beauty and health of trees and attempt to reduce the risk of living near trees. Trees can be managed,
but they cannot be controlled. To live or work near a tree involves some degree of risk. The only way to eliminate all risks
associated with a tree is to eliminate the tree.

Clients may choose to accept or disregard the recommendations of Consult Arborist Pty Ltd or to seek additional advice.

19_02_07_AA_205 Blueberry Drive Bagge 10 of

“Page 10 of 14

Page 29

Consult Arborist

 

APPENDIX 1 ~ DEFINITION OF TERMS

The following criteria have been used in the report to gather information and determine the required management
options on the grounds of public health and safety. Measurements are approximate and made visually by eye
unless otherwise stated.

 
 
  

    
  

 

  

 

 

Young: Early stage of growth, immature size, established

Early Mature: Fast growing well-established tree which has not yet reached mature size

Mature: The tree reached its mature size, exhibits slowing growth rates with early stages of naturally forming dead
or dysfunctional wood.

 

Over Mature: The tree has reached maiure size and is unlike to increase significantly in height or mass. Retrenchment of
the upper crown with increased vegetative vitality in lower crown, increased fungal activity and wood decay,
increase colonisation by flora and fauna.

Veteran: Tree with advanced retrenchment, a reduced crown size and annual increment growth, extensive hollowing,
crown collapse, low vigour, advance heartwood advanced colonisation by fauna and flora.

 

     
 

 

Good: | | Tree with no defects or disorders which are notable. Full canopy with good colour foliage. Minimal pathogen

 

damage.
Fair: Tree with minor defects or disorders which are notable. Some deadwood within what can be an unbalanced

canopy, foliage generally with good colour although some discolouration may be present typical of species
in location. Minor pathogen damage.

Poor: Tree with major defects or disorders which are notable. The tree has considerable deadwood present,
discoloured or distorted leaves indicating a further decline of the tree. Detrimental pathogen damage.

Dead or dysfunctional moribund tree.

 

 

   

  
     

 

   

 

 

 

Good: Tree with good unions and no branch defects. Sound trunk with no / minor defects. Good buttress and root
structure.

Fair: Tree with minor defects or disorders which are notable. Small areas of bark missing. Small cavities or minor
unfavourable branch unions may be present. Minor damage fo roots.

Poor: Tree with major defects, large hollows, weak unions and/or problematic damaged roots.

 

 

Hazardous: This implies a tree with a major defect that may fail at any time

   
 

   
 

  

This retention val mes from the Institute of Australian Consulting Arborists (ACA), 2010, IACA Significance of a Tree,
Assessment Rating System (STARS), Institute of Australian Consulting Arboriculturists, Australia, www.iaca.org.au -
http://www. iaca.org.au/home/index.php/publications/71-stars

The process uses the Retention Value — Priority Matrix by assessing the Tree Significance Assessment Criteria and crossing
it with the Estimated Life Expectancy to determine the following ratings:

High: Priority for Retention

These trees are considered important for retention and should be retained and protected. Design
modification or relocation of building/s should be considered to accommodate the setbacks as prescribed by
the Australian Standard AS4970 Protection of trees on development sites. Tree sensitive construction
measures must be implemented e.g. pier and beam etc. if works are to proceed within the Tree Protection
Zone.

Medium: Consider for Retention

These trees may be retained and protected. These are considered less critical; however, their retention
should remain a priority with removal considered only if adversely affecting the proposed building/works and
ail other altematives have been considered and exhausted.

Low: Consider for Removal

These trees are not considered important for retention, nor require special works or design modification to
be implemented for their retention.

Remove: Priority for Removal

These trees are considered hazardous, or in irreversible decline, or weeds and should be removed
irrespective of development.

 

 

 

 

 

  
 

 

 

 

     
 

” Diameter at Breast Height - The approximate diameter of the trunk is measured visually in millimetres ata
height of 1.4m.

 

 

19_02_07_AA_205 Blueberry Drive Page 11 of 11

Page 30

205 Blueberry Drive
Operational Works Application

Email from Clint Bevan, Network Integrity Team, Telstra Operations regarding Telstra services:
From: "Bevan, Clint" <Clint.N.Bevan@team telstra.com>

Subject: Lowering Telstra assets for driveway at 205 Blueberry Drive Black mountain.
Date: 30 January 2019 at 9:17:42 AM AEST

To: Anthony Wardrop <[email protected]>

Hi Anthony, please feel free to pass this email and my contact details on to council or other stake holders to assist in your development application.

After studying the supplied plans | am of the opinion that the Telstra conduit/s will have to be lowered to obtain the required cover under the proposed driveway.

As discussed | would suggest that you first have the bulk earth works completed. That will give us final excavation levels to work from. Once this is done we will know how

much lowering work is required and | can arrange for quote accordingly. Care will need to be taken when excavating and exposing the Telstra conduit.

Above the Telstra conduit, the survey plan (Callaghan & Toth drawing No1901-1) indicates a 4.5mt wide driveway with an additional batter on each side of approx imt. To
obtain our required cover | would expect that we will excavate and undermine our conduit for a distance of approx 30mt (15mt each side of centres).

The order of events would be 1. Bulk excavations done, 2. Telstra lowers network, 3.driveway constructed.

To lodge a project with Telstra, please fill out the attached and email it to the highlighted address on the form. You Cc me in as well. Please pass on the expected timing of

works when known.

Telstra has no objection to you proceeding with the driveway excavation with the understanding that the conduit will be lowered prior to construction of the driveway.

Regards

Clint Bevan
Mob 0408 155 652

sh Netvork integrity Team

Network Construction Services

Telstra Operations.

36 King St, Caboolture 4510.

PLEASE CONSIDER THE ENVIRONMENT BEFORE YOU PRINT THIS E-MAIL!

Page lofi

Page 31

205 Blueberry Drive, Black Mountain

Operational Works Application — Photographs

Photographs Before Asbestos Remediation Works

 

 

Photographs After Asbestos Remediation Works

 

 

Used in these records

About this file

File size
15.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Works Application OPW19-0033.pdf · 15.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.