Council archive · source document
Operational Works Application OPW19-0033 · OPW19/0033
Very large file (15.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Background Considerable deliberation has been given to the location of the proposed vehicle crossover and other elements the subject of this application, taking into account site conditions/characteristics, the presence of existing services, and proposed house design. The proposed location has been discussed with Martin Sergas, our private engineer, certifier and building designer. This Operational Works application is required as: * the proposed driveway is considered ‘non-standard’ due to the existing site profile; and * proposed works include the removal of three (3) street trees; and * alterations to the profile of the nature strip is also proposed. Asbestos Removal In February 2018, pieces of asbestos sheeting were discovered which had been illegally dumped/hidden on Council’s nature strip at the front of the site. Initial testing and removal works were completed at our own cost. Further pieces were subsequently discovered, and Noosa Council then carried out additional removal works over an extensive area spanning 15 metres, and at considerable financial cost. (Please contact Eddie Stevens, Noosa Council for further information). The removal works included the removal of a depth of around 100mm of earth and vegetation in the problem area. Please refer to photographs attached to this application showing the affected area before and after the remediation works. Location As per attached engineering drawings, the location of the crossover has been chosen for the following reasons: ° To seal the area permanently: Upon completion, the vehicle crossover in this location would enable area to be sealed permanently by concrete/bitumen which would prevent the risk of any further asbestos sheeting pieces from coming to the surface in the future. The removal of the two street trees in this position are required to facilitate these works. These are referred to as ‘Tl’ in the attached Arboricultural Appraisal. * Excavation works are already partially complete: Council’s asbestos removal works required the excavation of approximately 100mm of top soil from the problem area. These works have in effect, begun the excavation required for a vehicle crossover in this location. * The underground services are the deepest in this location: The proposed location of the vehicle crossover is confirmed to be situated where the existing underground Energex and Telstra services are at the deepest location on the property frontage. This will facilitate the construction of the crossover with least disturbance. In addition, it has been concluded that there is no other location along the property frontage which doesn’t have some degree of conflict. The chosen location is positioned towards the western end of the property frontage. This is away from the intersection with Watergum Place so as to ensure that access/egress from both our property and Watergum Place will be uncompromised. Services The attached ‘Longitudinal Section’ drawing by Callaghan & Toth engineers, shows the proposed crossover being in conflict with the existing underground Telstra line position. As a result, the proposed works have been discussed with Clint Bevan (Network Integrity Team, Telstra), see email Page 2 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW19-0033.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.